My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.2 Joint Road Project Request for Proposal (RFP)
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
11-10-2020 City Council Meeting
>
09.2 Joint Road Project Request for Proposal (RFP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 4:10:59 PM
Creation date
3/8/2021 3:39:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 14 of 19 <br /> <br />such meetings shall be kept by the Consultant and shall become part of the <br />permanent project records, also being shared with the City/Township Coalition. <br /> <br />2.2.6. Parcel Research <br /> The Consultant shall perform detailed ownership research on all parcels that are <br />identified as impacted or have the potential to be impacted by the construction of <br />this project. In addition to this research, the consultant shall define the existing <br />right-of-way and gather all supporting documentation. Final records shall include all <br />necessary parcel documents for future right-of-way purchase. It is the Coalition’s <br />preference, to acquire right-of-way in the form of “easement of record” rather than <br />“fee title” purchase. <br /> <br />2.2.7. Final Right-of-Way Determination and Acquisition <br /> The Consultant shall determine the necessary proposed right-of-way, temporary <br />easements, and drainage easements needed to complete this project, based on the <br />construction limits determined in the preferred geometric layout. At a minimum, the <br />consultant shall develop a tabulation of ownership, easement acreage, easement <br />costs, damages, and cost to cure for each identified parcel in the right-of-way <br />determination process. An overall cost to purchase right-of-way for this project must <br />be included with the Consultant’s recommendation of right-of-way determination. <br /> <br />Upon approval from the City/Township Coalition, the Consultant shall use this <br />information for acquiring the necessary easements to construct the road. The <br />Consultant will lead the right-of-way acquisition process by notify landowners, <br />staking parcels, contracting appraisals, mailing purchase offers, and starting the <br />condemnation process if necessary. In the event that a condemnation hearing is <br />required, the consultant may request additional payment for participation in said <br />process. <br /> <br />2.2.8. Construction Cost Estimates <br /> An estimate for total project costs, including local agency cost participation, will <br />be produced for the preferred layout and final plan. This estimate shall be broken <br />down to include project cost for construction, right of way, design, and construction <br />management. The cost estimate shall be further split by logical segments if staged <br />construction is realized. Accurate cost estimates are greatly important to ensure <br />proper funding is in place for future construction. The consultant shall provide <br />updated estimates upon request from the City/Township Coalition or any local <br />agency partner. <br /> <br />2.2.9. Plat Survey <br /> The Consultant will provide a highway right-of-way plat and all legal descriptions <br />as appropriate for the project. The final highway plat shall be approved by the Crow <br />Wing County Survey Planning Coordinator and recorded at the County Recorders
The URL can be used to link to this page
Your browser does not support the video tag.