My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1C CUP - Storm Water Management Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2021
>
01-21-2021 Planning & Zoning Commission Meeting
>
4.1C CUP - Storm Water Management Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2021 12:13:41 PM
Creation date
1/15/2021 12:13:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��� ��� 3440 Federal Drive, Suite 110 WORKSHEET <br /> Eagan, MN 55122 <br /> Direct:651.337.6729 By. BJQ Date: 12/21/2020 <br /> ��C��h ��� Office:651.452.5051 Project No: 591.336 Sheet of <br /> ���&�� Website: www.rehder.com Subject: <br /> VOLUME CONTROL SIZING CALCULATIONS <br /> REQUIRED VOLUME: (1 inch off of impervious) <br /> Proposed Impervious Area = 3.37 Acres <br /> = 1.00 X 3.37 ac 0.281 ac-ft <br /> 12in./ft <br /> = 1.,2,?33 cu.ft. <br /> PROVIDED VOLUME: <br /> Infiltration Basin 1 = 10,654 cu.ft. <br /> Infiltration Basin 2 = 9,538 cu.ft. <br /> Infiltration Basin 3 = 6,155 cu.ft. <br /> Total Volume Provided = 26,347 cu.ft. <br /> (See HyrdoCAD Storage Table) <br />
The URL can be used to link to this page
Your browser does not support the video tag.