Laserfiche WebLink
Total Monthly Flow: 2,204,258 gallons <br /> Operations Report <br /> 1) Water treatment facility inspections were completed daily. <br /> 2) Wastewater facility and lift station checks were done every Mon, Wed, and Fri. <br /> 3) Monthly lift station maint. (check amps, clean floats, inspect wet well, etc.) 9/23. <br /> 4) Weekly water testing was completed. <br /> 5) Water meters were read on 9/23. <br /> 6) Monthly fluoride report was submitted to Minnesota Department of Health on 9/1. <br /> 7) Monthly Discharge Monitoring Report for the WWTP was submitted to MPCA on 9/1. <br /> 8) Quarterly Discharge Monitoring Report for the WTP was submitted to MPCA on 9/1. <br /> 9) City-wide cleaning of the City's gravity sewer lines is complete for 2020. <br /> 10)Spray irrigation of the City's treated wastewater wrapped up in mid-September and end- <br /> of-season repairs and maintenance to aeration lines was completed. Oil was changed <br /> out on irrigation pumps and aeration blowers and air intake filters replaced on the <br /> blowers. We also drained the irrigation system for winter. <br /> 11)There was an afterhours call out to the main lift station in early September that required <br /> some pumping by Northland Septic. There was a problem with incoming power to the <br /> electrical panel. MN Power was contacted and the issue was resolved. <br /> 12)Anderson Bros completed a sewer line insulation/paving project on Front Street that has <br /> been on our to-do list for the last three years. They did a nice job and our freezing <br /> issues on that street should be eliminated. <br /> 13)Hydrant flushing was completed on September 17`h. All went well. <br /> �'1'ater/«'W Portion Submitted b�� Andre��� Sch���artz, Operations ��anager, Pine River Area <br /> Sanitar�� Dist►•ict. Please feel fi�ee to call his cell at 320-2�2-57�7 �vith any questions/concei7ls ti�r 24- <br /> h��ur elnergency service call 218-851-9060 <br />