My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.02 Heart of the Good Life Professional Services Proposal
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
09-01-2020 City Council Meeting
>
09.02 Heart of the Good Life Professional Services Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2020 1:01:26 PM
Creation date
8/27/2020 1:01:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
August 25, 2a2o W i DSETH <br /> City of Pequot Lakes <br /> HOTGL Larsen Parkway Improvements <br /> Page 3 of 5 <br /> 21. Issue a Notice of Award to the Contractor, and request bonds and insurance. <br /> 22. Review the Contractor's bonds and insurance for conformity to the construction Contract, obtain <br /> signatures on the Agreement, and prepare conformed construction Contracts for the City, the <br /> Contractor, and our project files. <br /> 23. Send out invites, prepare an agenda, conduct the pre-construction meeting, and distribute minutes. <br /> This will include review of DEED BDPI requirements. <br /> 24. Coordinate, in conjunction with the Contractor and the City,with other utilities. <br /> 25. Review the Contractor's schedules. <br /> 26. Review the Contractor's shop drawings on materials to be incorporated into the work. <br /> 27. Establish horizontal and vertical control in the field for construction staking and for use by the <br /> Contractor. <br /> 28. Provide construction staking for sanitary sewer, watermain, storm drainage, roadway grading, and curb <br /> and gutter for the Contractor as specified in the construction documents. <br /> 29. Provide a construction observer. This person will coordinate with City Public Works Staff when they can <br /> observe construction. Due to the type of work and other Public Works Staff duties we anticipate our <br /> construction observer will be on-site 5 days a week for 10 hours a day over an estimated 4-week <br /> construction schedule. <br /> 30. Conduct construction worker wage and benefit interviews and provide necessary follow-up in <br /> accordance with DEED BDPI requirements. <br /> 31. Prepare agendas, conduct weekly on-site progress meetings, and distribute minutes. <br /> 32.Answer questions from the Contractor, and construction observer. <br /> 33. Coordinate with the material and field-testing geotechnical firm hired by the City. <br /> 34. Work with the Contractor on draft payment applications, prepare final monthly payment applications for <br /> the City Council to consider, and transmit all necessary related paperwork between the City and the <br /> Contractor. <br /> 35. Throughout the project, work with the City on preparing and submitting disbursement requests—and <br /> maintaining records and documentation and Jobs Reports-to meet the DEED BDPI requirements. <br /> 36. Conduct a walk-through with the City and the Contractor towards the completion of the project. Prepare <br /> a "punch IisY' of items the Contractor still needs to complete. <br /> 37. Address with the Contractor the various paperwork items to close out the construction Contract. <br /> 38. Conduct"As-Built" survey and prepare drawings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.