My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01 - Water/Wastewater Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2009
>
08-04-2009 Council Meeting
>
09.01 - Water/Wastewater Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2014 11:13:04 AM
Creation date
6/18/2014 11:12:47 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
They do fill several trucks a day and have an irrigation system for their yard. I gave her <br />a few meter monitoring sheets so she can determine where all the water is going. <br />• July 24th, removed water meter and MXU from 31055 Front St. by owner's request. <br />Wastewater Dept. <br />I. Facility Performance: <br />a. CBOD Concentration <br />Influent — mg/1 <br />Effluent — mg/1 <br />b. TSS Concentration <br />Influent — mg/1 <br />Effluent — mg/1 <br />(No Design Listed) <br />(No Design Listed) <br />c. Effluent Fecal Coliform Geometric Mean — <10 organisms /100 ml (taken on the 20th) <br />Permit Condition — 200 organims /100 ml <br />d. Flow - Average Daily Flow — 59,000 gallons (Design — 121,795 gal/day) <br />Maximum Daily Flow — 68,000 gallons <br />Minimum Daily Flow — 41,000 gallons <br />Total Monthly Flow — 1,581,000 gallons (As of the 28tH) <br />II. Operations and Maintenance: <br />• The monthly MPCA Discharge Monitoring Report was completed and submitted as <br />required. <br />• July 1St, discovered that the sewer service to the clinic had been missed while installing <br />sewer main on W. Woodman St. Got some sewer - tracing dye from Breezy Point to help <br />us determine that the other services were alright. The clinic's service was connected the <br />following day. <br />• Lance and I flushed and jetted the new sewer main on W. Woodman St. to remove some <br />sand that had gotten in it. <br />• July 16th, completed an upgrade to our lift- station monitoring software (Omni -Site) <br />• Continue to irrigate as often as I can. Our pond levels are looking much better. <br />Report Submitted By: Tina Nolden (Water /Wastewater Operator) <br />L' Please call me if you have any questions /comments. <br />218 -568 -5604 or 218 - 820 -2125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.