Laserfiche WebLink
io.The developer has provided financial security in the amount of <br /> $281,250.00,which represents i25% of the estimated cost of the <br /> uncompletedimprovements. (l,t�ttf�x t,f t'��E�dit"?) <br /> ii. An independent Plat Check has not been received. <br /> Planning Commission Direction: The Planning Commission should <br /> develop findings to either approve or deny the Final Plat. In general, the <br /> Commission cannot deny a Final Plat unless the applicant will not or cannot meet <br /> the final platting requirements or the conditions of the Preliminary Plat approval. <br /> The Commission cannot impose additional conditions that do not fall directly <br /> within the guidelines of the Final Plat or relate directly to conditions imposed in <br /> the Preliminary Plat. <br /> The Commission also has the option to table the Final Plat to obtain additional <br /> information. <br /> Staff Recommendation: Based on the Findings of Fact presented in this <br /> report, the Staff recommends approving the application, subject to the following <br /> condition: <br /> i. All documents must be acceptable to the City Attorney prior to Council <br /> approval of this Final Plat. <br /> In addition, before the final plat is signed by the city the applicant shall provide <br /> the following: <br /> a) "Pumphouse details" referenced on Sheet 3 and Sheet 4 of the plans for the <br /> water distribution system. (��'E� ha��e i•ecei�ed t�iis) <br /> b) A copy of submittals (and response) to the Minnesota Department of <br /> Health regarding the water well, pumphouse and water distribution <br /> system. <br /> c) A copy of the Construction Stormwater General Permit from the <br /> Minnesota Pollution Control Agency(MPCA). <br /> d) Updated erosion control plan to include a double row a silt fence or a <br /> combination bio-rolls (bio-logs) and silt fence located on the west/south <br /> side of Unit i to the east side of Unit 2. <br /> e) Updated stormwater management plan to include a 6-inch to 12-inch tall <br /> vegetated (mowable) berm outside of the toe of sloped areas to prevent <br /> direct stormwater runoff to wetlands and adjacent properties. <br /> fl Updated specifications on the private road/driveway which includes <br /> pavement thickness. <br /> Before permits are issued for the development the applicant shall provide the <br /> following: <br /> i) Copies of all required plumbing permits for the dwelling units from the <br /> MN Department of Labor and Industry. <br /> Pequot Lakes Staff Report 3•2-5 <br /> August 20,2020 <br />