Laserfiche WebLink
execution of appropriate agreements assuring performance? <br /> (2) Does the Final Plat or Final Condominium Plat agree with <br /> the Preliminary Plat or Preliminary Condominium Plat? <br /> (3) Does the City Attorney agree that all parties with an <br /> interest in the property are shown as signers of the <br /> document? <br /> (4) Does the City Engineer agree that all improvements <br /> required are satisfactorily completed or are guaranteed by <br /> contract with adequate financial security? <br /> (5) Does an independent Professional Land Surveyor agree that <br /> the final document meets the statutory requirements? <br /> (6) Has financial security been posted in the appropriate <br /> amount? <br /> Staff Findings: Staff provides the following Findings of Fact for consideration <br /> by the Planning Commission: <br /> i. The development of the subdivision and planned unit development are in <br /> substantial conformance with the approved Preliminary Plat, site plan and <br /> elevations that govern the general location of lots, roadways,buffers, <br /> infiltration basins and improvements dated Apri18, 2oi9. <br /> 2. The Final Plat agrees with the Preliminary Plat. The design has not <br /> changed since Preliminary Plat approval. <br /> 3. The City Engineer has reviewed and approved the excavation, grading or <br /> other terrain disturbance, and final plans for all infrastructure. <br /> 4. The applicant has complied with Conditions 4, �and 8 as they are <br /> included in the Declaration. <br /> 5. Lot i6 (greenspace) shall not contain any structures. The Water Utility <br /> Plan indicates 3 flushing hydrants with 2" connection for fire hose. <br /> 6. The cluster sewer system design conforms to Minnesota Pollution Control <br /> Agency Standards (Chapter�080 — �083 of the Minnesota Administrative <br /> Rules) and the design has been reviewed and approved by Tom Espersen, <br /> a licensed Advanced Inspector per Minnesota Rules. <br /> �. The City Engineer has reviewed and approved the cluster water system <br /> conforms to the Minnesota Department of Health Rules and Regulations <br /> MHD 2io — 230 "Water Well Construction Code". <br /> 8. The review by the City Attorney is pending. <br /> 9. The developer has paid a park dedication fee in the amount of$i4,o4o.00. <br /> Pequot Lakes Staff Report 3•2-4 <br /> August 20,2020 <br />