Laserfiche WebLink
EDC Minutes <br /> May 19, 2020 <br /> Page 3 of 8 <br /> ----------------------------- <br /> Ms. Malecha showed the EDC the Utility Study that WSN did for the City in 2018 <br /> and reminded them the total project cost per acre for the utilities infrastructure <br /> was just around 42,000 and stated that it is comparable to what Xcel is proposing <br /> for just the infrastructure costs. <br /> Commissioner Lubke confirmed with Ms. Malecha that this was the agreement <br /> that was exempt from the Close Converse agreement. <br /> Discussion ensued about the design and screening. Mr. Mauseth stated that they <br /> will work with the City on the screening requirements. <br /> Commissioner Lubke asked about the cost of the road�to get to the site. Tim <br /> Houle stated that in phase one in the 2018 Utility Study t1�e total project cost for <br /> both sewer and water extensions and the road is�pproxim�tely$250,000. He <br /> stated that they do not have a more focused��`specificall�r,vn what Xcel is <br /> proposing therefore that number might c �ge a little bit but th��s a ballpark <br /> figure. ���� <br /> , , s <br /> „ �, <br /> Commissioner Lubke asked if everything v�%'�i�±�,t, r�in��e at the en��of phase <br /> ,��,i�� <br /> one and Mr. Houle said that would be my recc����endation. <br /> ,.; <br /> Commissioner Lubke asked if�th�r�are any reveni����im,ates based upon the <br /> tax rates and the valuation yet and Nls, Malecha statee��ey do not have that <br /> �s <br /> information yet. ;�' <br /> Discussion ens����Y"C�t gathering r�ore inform�#ion relating to cost of the <br /> phases of inf�tructur`��d rescheduling the topic out until the June meeting. <br /> �� % <br /> COMMISSION��~�.ELV��1 MOVED Tfl��INCLUDE THE XCEL BUSINESS <br /> PROPOSAL IN Y��y��������������VIISSION MEETING AGENDA TO <br /> ALL�11V��il��E TIM���`� HAVE� ���RMATION GATHERED. <br /> COMMISSIOI�(�R RIE��;��,ECONDED THE MOTION. MOTION CARRIED 5-2. <br /> COMMISSIONER LUBKC���HOLLEY OPPOSED. <br /> �;; <br /> 4.2. Business Development Public Infrastructure (BDPI) FundinQ Assistance Proposal <br /> Tim HoulE clarified with the EDC that the Heart of the Good Life Development, <br /> the study ph��e drawing and the lots are not set yet. He stated that it was just a <br /> concept and i#he recalls correctly they wanted to have flexibility therefore the <br /> City still has that flexibility. He stated that extending sewer and water and <br /> extending that first leg of the roadway is very appropriate with Xcel's proposed <br /> project. He said they kind of have this roadway already out there and they have <br /> the utilities extended therefore you can jump off of as there is another potential <br /> lot or more to the West between that proposed road and the Paul Bunyan trail. <br /> Mr. Houle stated that the costs were gathered together and then broken down <br /> per acre therefore that is how the estimate was put together. He stated that they <br /> have wonderful flexibility and if they do have to extend sanitary sewer, water <br /> main, and put in some storm sewer in street the state has a Business <br />