My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8(a) Downtown Plan Update - Neighborhood Evaluation
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2020
>
01-16-2020 Planning & Zoning Commission Meeting
>
8(a) Downtown Plan Update - Neighborhood Evaluation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 9:30:40 AM
Creation date
1/7/2020 9:30:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
an all-way stop and roundabout control. Traffic volumes are too high and balanced to consider side- <br /> street stop control. The benefits of all-way stop over a signal is usually seen during off-peak times when <br /> vehicle volumes are lower. The same is true for a roundabout. Roundabouts can handle higher traffic <br /> volumes than all-way stops and have been proven safer than traditional intersections, preventing most <br /> serious injury and fatal crashes. Due to the large construction costs for a roundabout, it was determined <br /> that the timing on the existing signal could be updated. <br /> The Traffic Study noted that Main Street east of Patriot Avenue is approximately 45 feet wide. With two <br /> westbound lanes and one eastbound lane on this block, Main Street could be reduced in width. With <br /> the Paul Bunyan Trail crossing on this block, reducing the width of the roadway would reduce pedestrian <br /> and bicycle exposure time at this location. This could be achieved by adding a bump out on the south <br /> side of Main Street at the trail crossing, reducing the eastbound through lane to be approximately 12 <br /> feet wide. This could be done using pylons or with a concrete curb extension. <br /> The Traffic Study also looked at the intersection of Main Street and Rasmussen Road. This is an all-way <br /> stop control with one lane on each approach. Other control types available would be either a single- <br /> lane roundabout or a side-street stop-controlled intersection. A roundabout may not be a good option <br /> at this location due to the need for a larger footprint. A side-street stop control would remove the stop <br /> signs along Main Street. Vehicles along Main Street would no longer need to stop at this intersection <br /> meaning speeds will be increased through the intersection. Wi#h pedestrian crossings on all sides of this <br /> intersection, higher speeds would not be desired and would make crossing more difficult and likely less <br /> safe. Changing the traffic control at this intersection may not be appropriate. In addition,to <br /> accommodate pedestrians/bicycles as well as keep heavy vehicle traffic on main routes, one way to <br /> accomplish this would be install curb bump outs to reduce the crossing distance and making it more <br /> challenging for large vehicles to turn. The bump outs could be created with paint and pylons. <br /> Utility Overview <br /> • Sanitary sewer(Front Street to Rasmussen Road) <br /> • City water(Front Street to Rasmussen Road) <br /> • Storm sewer(Front Street to Washington Avenue) <br /> Traffic Study <br /> • Add removable curb bump outs. <br /> Street Maintenance Revenue: $6,262.83 <br /> Street Maintenance Cost: $131,950 <br /> Percent of Cost Covered by Adjacent Property Tax: 65% <br /> Walkability Score: Very Good <br /> Redevelopment Potential: High <br /> Incremental Repair <br /> • Eliminate Second Street intersection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.