My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.02 Rasmussen Road & South Washington Avenue Improvement Project Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
01-07-2020 City Council Meeting
>
09.02 Rasmussen Road & South Washington Avenue Improvement Project Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 12:20:06 PM
Creation date
1/2/2020 12:20:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM #9.2 <br /> c��y of <br /> Pequot <br /> Lakes_ <br /> REPORT TO CITY COUNCIL <br /> Report Prepared by: Tim Houle <br /> Date: January 7, 2020 <br /> Subiect: Rasmussen Road & South Washington Avenue Improvement Project <br /> Update <br /> Report: The following are several updates on the Rasmussen Road and South <br /> Washington Avenue Improvement Project. <br /> • Advertising / Bid Opening Schedules - <br /> We are still shooting for bids to be opened on Tuesday, January 28th. There <br /> are still details being worked on, and depending on questions from bidders, <br /> we might need to push it back a week or two. We are planning on <br /> advertising once in the Pine and Lakes Echo Journal on Thursday, January 9, <br /> 2020 as well as on QuestCDN (an on-line service that contractors check). <br /> • Acquiring Right-of-Way (R/W) - <br /> As previously mentioned, there are places where there is no formal R/W. <br /> The Study's project cost did include an estimate of the cost (survey, legal, <br /> acquisition) to formalize and obtain R/W and easements. As part of our <br /> scope, we are preparing survey descriptions of the area needed for R/W and <br /> permeant easements. While not part of our scope, we are working with City <br /> staff on communicating with those property owners the City needs to acquire <br /> R/W and easements from. The approximate number of parcels involved is <br /> 21. <br /> • Proposed Parking Change / Layout for South Washington's First Block - <br /> As we proceeded into final design, there was concern on fitting both 90 <br /> degree parking on the east and parallel parking (at least in the northern half <br /> next to the Legion) on the west. We have eliminated the proposed parallel <br /> parking on the west and have laid out 90 degree parking stalls on the east. <br /> We will have the same number of stalls before versus after. We request <br /> Council consensus on this. <br />
The URL can be used to link to this page
Your browser does not support the video tag.