My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 Public Works Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
12-03-2019 City Council Meeting
>
09 Public Works Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2019 2:58:29 PM
Creation date
11/26/2019 2:58:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- Council meeting &prep <br /> - Explored flag lighting options and policies for US Flag in new display <br /> - Met with local entities in regards to Resolution of Cooperation for Roadway Improvements <br /> - Attended a Winter Maintenance Training Event at Crow Wing County Office <br /> - Attended monthly Safety Meeting <br /> Compiled and submitted by Pequot Lakes Public Works Director—Jason Gorr <br /> Please direct questions to: (612)810-9478 or i�orr(a�pequotlakes-mn.gov <br /> Water Dept. <br /> Facilitv Performance for October 2019: <br /> Flow <br /> Average daily gallons pumped: 85,000 gallons <br /> Maximum daily gallons pumped: 128,000 gallons <br /> Minimum daily gallons pumped: 58,000 gallons <br /> Total monthly gallons pumped: 2,563,000 gallons <br /> Lab <br /> Average daily chlorine concentration: 0.39 (mg/1) <br /> *Recommended chlorine concentration: 0.2 to 0.5 mg/1 <br /> Average daily fluoride concentration: 0.55 (mg/1) <br /> *Recommended fluoride concentration: 0.5 mg/1 to 0.9 mg/1 <br /> Wastewater Dept. <br /> Facilitv Performance for October 2019: <br /> Flow <br /> Average Daily Flow: 62,357 gallons (Design— 121,795 gaUday) <br /> Maximum Daily Flow: 73,389 gallons <br /> Minimum Daily Flow: 51,479 gallons <br /> Total Monthly Flow: 1,933,081 gallons <br /> Operations Report <br /> 1) Water treatment facility inspections were completed daily. <br /> 2) Wastewater facility and lift station checks were done every Monday, Wednesday, and <br /> Friday. <br /> 3) Monthly lift station maintenance(check amps, clean floats, inspect wet well, etc) was <br /> completed on 11/18. <br /> 4) Weekly water testing was completed. <br /> 5) Water meters were read on 11/21. <br /> 6) Monthly fluoride report was submitted to Minnesota Department of Health on 11/4. <br /> 7) Monthly Discharge Monitoring Report for the WWTP was submitted to MPCA on <br /> 11/1. <br /> 8) Jake Freeman replaced handles on raw sewage pumps at the Super Valu and Isabelle <br /> lift stations. <br /> 9) Some pipe work will be done at the lift station on Isabelle in the next couple weeks. <br /> We are also looking at replacing some bad check valves at the lumberyard lift station <br /> Respectfully submitted by: <br /> Andrew Schwartz Operations Manager, Pine River Area Sanitary District <br /> Please feel free to call my cell at 320-232-5787 with any questions/concerns <br /> For 24-hour emergency service call 218-851-9060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.