My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.06 North Sluetter Road Project
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
11-05-2019 City Council Meeting
>
09.06 North Sluetter Road Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2019 2:11:57 PM
Creation date
10/31/2019 2:11:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Rustic Road- $162,384 (Per MN Statute 160.83, a rustic road must have the <br /> following characteristics: outstanding natural features or scenic beauty; an <br /> average daily traffic volume of less than 150 vehicles per day; year-round <br /> use as a local access road; and maximum allowable speed of 45 miles per <br /> hour.) <br /> A couple of things that are not included in the pricing: <br /> • Culverts: Should be around $3,500-$5,000 each for replacement depending <br /> on the size and length. <br /> • Clearing and grubbing: Without doing extensive work in the field I cannot <br /> give you a good guess as to where that would come in at. Depending on <br /> how many, how big the trees are and how easy they will come down, this <br /> could be in the $S,000-$10,000 range. <br /> • Ditchwork: Again, without any real extensive work on our end, I have no <br /> idea the volume of dirt that would be needed to fill in the slopes to the <br /> requirements you had sent. I don 't know for sure if there is even enough <br /> room to fit in the specs for the rzcral road which would amount to a fairly <br /> substantial increase to the pricing. It could be upwards of$20,000 or <br /> higher depending on what needs to be done. <br /> • Topsoil: I would assume the city would want all of the slopes covered in 4" <br /> of topsoil and then seeded. To stick a number to that, if S' were figured on <br /> both sides of the road, you're looking at another $20,000-$25,000 <br /> depending on how much topsoil was needed and what type of seed was <br /> spec'd out. <br /> • Utility relocations: May or may not need to be done. <br /> • Mailboxes: May or may not need to be done. <br /> • Striping: May or may not need to be done. <br /> With all of the items listed above that we did not include in the pricing, we would <br /> strongly encou�age you to get in contact with an engineer to have this project <br /> designed as some of the above mentioned items cannot be completed without <br /> propeY GPS work and design that we simply do not have the capabilities to <br /> perfoYm. The rural road in our opinion would need to be designed before we put <br /> actual numbers to things and the rustic road is borderline needing that as well. <br /> Council Action Requested: Council direction and clarification on the items <br /> brought forth for the North Sluetter Road Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.