My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 Public Works Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
11-05-2019 City Council Meeting
>
09 Public Works Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2019 1:19:42 PM
Creation date
10/31/2019 1:19:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Dept. <br /> Facilitv Performance for Sentember 2019: <br /> Flow <br /> Average daily gallons pumped: 108,000 gallons <br /> Maximum daily gallons pumped: 146,000 gallons <br /> Minimum daily gallons pumped: 75,000 gallons <br /> Total monthly gallons pumped: 3,134,000 gallons <br /> Lab <br /> Average daily chlorine concentration: 0.34 (mg/1) <br /> *Recommended chlorine concentration: 0.2 to 0.5 mg/1 <br /> Average daily fluoride concentration: 0.56 (mg/1) <br /> *Recommended fluoride concentration: 0.5 mg/1 to 0.9 mg/1 <br /> Wastewater Deat. <br /> Facilitv Performance for Sentember 2019: <br /> Flow <br /> Average Daily Flow: 62,598 gallons (Design— 121,795 gaUday) <br /> Maximum Daily Flow: 73,177 gallons <br /> Minimum Daily Flow: 51,578 gallons <br /> Total Monthly Flow: 1,877,931 gallons <br /> Operations Report <br /> 1) Water treahnent facility inspections were completed daily. <br /> 2) Wastewater facility and lift station checks were done every Monday,Wednesday, and <br /> Friday. <br /> 3) Monthly lift station maintenance (check amps, clean floats, inspect wet well, etc.)was <br /> completed on 10/16. <br /> 4) Weekly water testing was completed. <br /> 5) Water meters were read on 10/23. <br /> 6) Monitoring wells around the City's wastewater ponds were sampled on 10/8. <br /> 7) Monthly fluoride report was submitted to Minnesota Department of Health on 10/7. <br /> 8) Monthly Discharge Monitoring Report for the WWTP was submitted to MPCA on 10/7. <br /> 9) The MPCA Annual Water Filter Backwash Solids Report was completed and mailed on <br /> 10/22. <br /> 10)All wastewater pond aeration equipment has been cleaned and a few repairs made. The <br /> spray irrigation system is drained and ready for winter. <br /> 11)Annual jet-cleaning of the City's gravity sewer lines went well. All lift station wet <br /> wells have been cleaned. <br /> We are looking at replacing base elbows in the wet well of the lift station on Isabelle Dr. <br /> Respectfully Submitted by: <br /> Andrew Schwartz Operations Manager, Pine River Area Sanitary District <br /> Please feel free to call my cell at 320-232-5787 with any questions/concerns <br /> For 24-hour emergency service ca11218-851-9060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.