My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.01 Cooperative Community Enhancement Project
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
09-03-2019 City Council Meeting
>
05.01 Cooperative Community Enhancement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2019 12:07:17 PM
Creation date
8/28/2019 12:07:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
New Construction 5.5%-7.5% 1.5%-3% See below <br /> General Conditions Reimbursable Compensation for Construction <br /> Site services (full-time supervision and project management) costs are based on duration and <br /> scope of the project. These services will be estimated once the final scope and schedule is <br /> determined and billed as reimbursable costs according to the following rate schedule: <br /> . . . . <br /> Construction Executive $155.00 <br /> Pro'ed Director $140.00 <br /> P�o'ed Mana er Blended Rate—PM 1,2,3 $115.00 <br /> Superintendent $110.�0 <br /> Pro'ect En ineer $85.00 <br /> Pro'ect Administration $65.00 <br /> Design Team(Architects,E�gineers etc.) Based on Oesign Teams Current Rate <br /> Schedule <br /> ICS will develop a lump-sum amount for these services in conjunction with the City as the <br /> project scope is finalized. <br /> OWNER(SignatureJ ICS(SignatureJ <br /> Mr.Jefferv G. Schiltz, Mana�in�Partner <br /> (Printed name and title) (Printed name and titleJ <br /> (DateJ (DateJ <br /> ICS Consulting 4 City of Pequot Lakes <br />
The URL can be used to link to this page
Your browser does not support the video tag.