Laserfiche WebLink
New Construction 5.5%-7.5% 1.5%-3% See below <br /> General Conditions Reimbursable Compensation for Construction <br /> Site services (full-time supervision and project management) costs are based on duration and <br /> scope of the project. These services will be estimated once the final scope and schedule is <br /> determined and billed as reimbursable costs according to the following rate schedule: <br /> . . . . <br /> Construction Executive $155.00 <br /> Pro'ed Director $140.00 <br /> P�o'ed Mana er Blended Rate—PM 1,2,3 $115.00 <br /> Superintendent $110.�0 <br /> Pro'ect En ineer $85.00 <br /> Pro'ect Administration $65.00 <br /> Design Team(Architects,E�gineers etc.) Based on Oesign Teams Current Rate <br /> Schedule <br /> ICS will develop a lump-sum amount for these services in conjunction with the City as the <br /> project scope is finalized. <br /> OWNER(SignatureJ ICS(SignatureJ <br /> Mr.Jefferv G. Schiltz, Mana�in�Partner <br /> (Printed name and title) (Printed name and titleJ <br /> (DateJ (DateJ <br /> ICS Consulting 4 City of Pequot Lakes <br />