My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07 State of Minnesota Cooperative Agreement
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
08-20-2019 Special City Council Meeting
>
07 State of Minnesota Cooperative Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 8:25:22 AM
Creation date
8/15/2019 8:25:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b. The State shall permit the City to construct the Trail Connections as identified in Exhibit B,upon the <br /> State's approval of Final Plans and Specifications for the development or improvement of the trail <br /> connections. The design for the Trail Connections shall meet the requirements of the ADA. <br /> c. The State be permitted to review and approve any revisions to the Trail Connections as proposed by <br /> the City during the term of the Agreement. All proposed trail modifications and revisions shall meet <br /> the requirements of the ADA. <br /> d. The State shall permit the City to review and approve any modifications or revisions to the Trail <br /> Connections proposed by the State during the term of this Agreement. All proposed modifications <br /> or revisions to the Trail Connection shall meet the requirements of the ADA. <br /> e. The State will retain ownership of the State Trail corridor as identified in Exhibit A. <br /> f. The State reserves the right to inspect the Trail as any time to ensure that the City is in compliance <br /> with this agreement. <br /> CITY DUTIES AND RESPONSIBILITIES <br /> a. The City shall design, construct or improve the Trail Connections as defined in Exhibit B, including, <br /> as necessary,the administration of any construction contract,as well as providing all construction <br /> engineering, staking, materials testing,record keeping and construction inspection. <br /> b. The City shall permit the State to review and approve the preliminary and final plans and <br /> specifications for the Trail Connections as developed by the City. All plans for the Trail Connections <br /> shall meet the requirements of the ADA. <br /> c. The City shall obtain all federal, state and local permits necessary for the construction of the Trail <br /> Connections. <br /> d. The City shall permit the State for review and approval any modification or revision to the Trail <br /> Connections proposed by the City during the tertn of this Agreement. All proposed modifications or <br /> revisions to the Trail Connection shall meet the requirements of the ADA. <br /> e. The City be permitted to review and approve any revisions to the Trail Connections as proposed by <br /> the State during the term of the Agreement. All proposed modifications or revisions to the Trail <br /> Connection shall meet the requirements of the ADA. <br /> f. The City will provide and install the appropriate signage for each Trail Connection, including <br /> directional and wayfinding signs. All signs placed within the State Trail rights of way shall be <br /> subj ect to approval by the State. <br /> g. Upon completion,the administration, operations and maintenance of the Trail Connections shall be <br /> the sole responsibility of the City. <br /> h. The City will retain ownership of its lands and trail associated improvements. <br /> i. Upon termination of this agreement,the City shall restore the State trail rights of way to a state <br /> consistent with its preconstruction condition and as approved by the State. <br /> III. FUNDING <br /> The State shall provide funding for its responsibilities under Article I(a)(b)(c)(d)(e)(�above through <br /> the standard internal purchasing process including,but not limited to,a separate requisition in which <br /> funds will be encumbered. The total obligation of the State is limited to the amount of funds <br /> legislatively appropriated and administratively allocated to this project. <br /> IV. LIABILITY <br /> Each party agrees that it will be responsible for its own acts and the results thereof to the extent <br /> Paul Bunyan State Trail-Pequot Lakes JPA <br /> Trail Connections <br /> MDNR 8/7/19 <br /> Parks and Trails Division Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.