My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07 State of Minnesota Cooperative Agreement
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
08-20-2019 Special City Council Meeting
>
07 State of Minnesota Cooperative Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 8:25:22 AM
Creation date
8/15/2019 8:25:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAUL BUNYAN STATE TRAIL AND MUNICIPAL TRAIL CONNECTIONS <br /> COOPERATIVE AGREEMENT <br /> BETWEEN <br /> THE STATE OF MINNESOTA AND THE CITY OF PEQUOT LAKES <br /> RESOLUTION 19- <br /> This Agreement,between the State of Minnesota, acting by and through the Commissioner of the Department of <br /> Natural Resources,hereinafter referred to as the "State" and the City of Pequot Lakes,hereinafter referred to as <br /> the "City". <br /> WITNESSETH: <br /> WHEREAS,the Commissioner of Natural Resources has the authority, duty and responsibility under Minnesota <br /> Statutes Section 85.015, sub. 15,to establish, develop,maintain and operate the Paul Bunyan State Trail System; <br /> and <br /> WHEREAS,the State and the City are authorized under Minnesota Statutes Section 471.59 to enter into <br /> agreements to jointly or cooperatively exercise common powers; and <br /> WHEREAS,the State owns land described as: Sec. 10 , T 136N, R 29W, Crow Wing County, as shown in the <br /> Map attached and incorporated into this agreement as Exhibit A; and <br /> WHEREAS,the State and City have determined that providing an improved recreational trail connections at the <br /> intersection of the Paul Bunyan State Trail and Main Street, at Trailside Park and at the entrance to the Pequot <br /> Lakes Chamber of Commerce and Trailhead and parking area, all municipal facilities, as identified in the maps <br /> attached and incorparated into this agreement as Exhibit B; and is of high priority; and <br /> WHEREAS,the City shall develop the improved recreational trail connections to the Paul Bunyan State Trail <br /> from Main Street,Trailside Park and the Pequot Lakes Chamber of Commerce Trailhead and parking area, <br /> hereinafter referred to as the"Trail Connections"; and <br /> WHEREAS,the City shall develop Preliminary and Final Plans and Specifications for the construction or <br /> improvements to the Trail Connections,which shall meet the requirements of the ADA and shall be approved by <br /> the State; and <br /> WHEREAS, the City shall be solely responsible for the design,development, administration and maintenance of <br /> the Trail Connections; and <br /> WHEREAS, a resolution or copy of the City counciUboard meeting minutes authorizing the respective entities to <br /> enter into this agreement is/are attached hereto as Exhibit C; and <br /> NOW,THEREFORE, in consideration of the mutual benefit to be derived by the public bodies hereto and for the <br /> benefit of the general public,the parties agree as follows: <br /> I. STATE'S DUTIES AND RESPONSIBILITIES <br /> a. The State shall provide technical assistance with the design of the Trail Connections as proposed by <br /> the City. <br /> Paul Bunyan State Trail-Pequot Lakes JPA <br /> Trail Connections <br /> MDNR 8/7/19 <br /> Parks and Trails Division Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.