Laserfiche WebLink
AGENDA ITEM #9.2 <br /> c��y of <br /> Pequot <br /> Lakes= -- <br /> REPORT TO CITY COUNCIL <br /> Report Prepared by: Nancy Malecha <br /> Date• July 2, 2019 <br /> Subiect: Road Improvement Plan Design Engineering Services Proposal <br /> Report: At the March St'' City Council Meeting, the Council directed Staff to <br /> bring back the Rasmussen Road Design Engineering Services Proposal submitted <br /> by Widseth Smith Nolting (WSN) along with the financial analysis and road <br /> improvement plan. Last month, the Council reviewed the road improvement plan <br /> and previously received the financial analysis presentation; therefore, attached is <br /> WSN's Design Engineering Services Proposal for Rasmussen Road, consisting of <br /> the two blocks north and south of Main Street, in the amount of$73,900. In the <br /> Proposal storm water needs, existing utility updates, curb/gutter, and scope of work <br /> are covered. <br /> Because the road improvement plan includes improvements to a longer segment of <br /> Rasmussen Road and South Washington Avenue, WSN's verbal proposal to <br /> incorporate these added segments is noted below. <br /> • Rasmussen Road from Tree Farm Road to East Woodman Street - $70,200 <br /> • South Washington Avenue - $32,200 <br /> • Total Revised Design Engineering Services Proposal - $176,300 <br /> Council Action Requested: Council discussion and approval of the revised <br /> Design Engineering Services Proposal submitted by Widseth Smith Nolting in the <br /> amount of$176,300 for Rasmussen Road from Tree Farm Road to East Sibley <br /> Street and South Washington Avenue to be paid from General Fund — Roads and <br /> Streets Department ($30,000), Highway 371 Fund ($121,300), Water Fund <br /> ($5,000), and Sewer Fund ($20,000). <br />