Laserfiche WebLink
should be established adjacent to existing Shoreline Commercial zones. The zone <br /> may not be established in an area where it is completely surrounded by residential <br /> zones. <br /> 3. Lot, Use and Density Requirements. <br /> GD RD ND <br /> Lake Lake Lake <br /> Lot width at OHW—feet, minimum 300 500 750 <br /> Buildable lot area- acres,minimum 2.5 5 10 <br /> Setback, right of way, City road- feet,minimum 30 30 30 <br /> Setback,right of way, County or State road, feet, minimum 50 50 50 <br /> Setback, side yard—feet, minimum 10 10 10 <br /> Setback, parking from lot lines—feet,minimum 10 10 10 <br /> Setback,between buildings—feet, minimum 10 10 10 <br /> Setback, corner side—feet, minimum 30 30 30 <br /> Setback, un-platted cemetery or archeological site—feet, 50 50 50 <br /> minimum <br /> Setback, sign from road—feet,minimum 1 1 1 <br /> Setback, OHW of lake—feet, minimum 75 150 200 <br /> Setback, ISTS from OHW - feet, minimum 75 75 100 <br /> Setback, wetland—feet, minimum 30 30 30 <br /> Impervious coverage -percent maximum 25% 20% 20% <br /> Building height, dwelling—feet,maximum 25 25 25 <br /> Building height, accessory structure—feet,maximum 13 13 13 <br /> Building above highest groundwater level—feet, minimum 3 3 3 <br /> 4. Performance Standards (SC�: <br /> A. Screenin�. Screening consisting of native trees and shrubs <br /> covering a minimum of 75 percent of the area(leaf on conditions) <br /> is required in the 50 foot lake, river, stream, wetland, and bluff <br /> buffers in order to retain the scenic beauty and rural character as <br /> viewed from roads. To obtain a construction permit in this district, <br /> a revegetation plan shall be required for existing properties that do <br /> not meet this standard. <br /> B. Buildin�s. Four unit or larger buildings or buildings open to the <br /> public shall be designed by a registered architect and shall meet the <br /> provisions of the State Building Code. <br /> C. Centralization of Moorin�Facilities. Uses that require short-term <br /> watercraft mooring for patrons must centralize these facilities and <br /> design them to avoid obstructions of navigation and to be the <br /> minimum size necessary to meet the need. <br /> Pequot Lakes Staff Report 3�b)-3 <br /> June 20,2oig <br />