Laserfiche WebLink
Wastewater Dept. <br />I. Facility Performance: <br />a. CBOD Concentration <br />Influent — 440 mg/1 (No Design Listed) <br />Effluent — mg/l <br />b. TSS Concentration <br />Influent — 248 mg/1 (No Design Listed) <br />Effluent — mg/l <br />c. Effluent Fecal Coliform — NA <br />Permit Condition — 200 organisms /100 ml <br />d. Flow - Average Daily Flow — 53,000 gallons (Design — 121,795 gal/day) <br />Maximum Daily Flow — 64,000 gallons <br />Minimum Daily Flow — 47,000 gallons <br />Total Monthly Flow — 1,578,000 gallons <br />II. Operations and Maintenance: <br />• The monthly MPCA Discharge Monitoring Report (DMR) was completed and <br />submitted. <br />• Nov. 2" d, Kurt and Lance did some sewer jetting. <br />• Also on Nov. 2nd, Infratech televised sewer main in the following areas: Rae Ave <br />Easement, along the west -side of Brunes Street, and they attempted to televise the sewer <br />main in the alley behind Thurlow's, but there was too much sand in the line and their <br />camera couldn't get past it. We have re- scheduled them to come out and thoroughly <br />clean the line so then they will be able to get it televised. We also need them to clean <br />and televise the line under TDS's Parking Lot. They are planning to come back the first <br />week of December to complete the work. The sewer main in the middle of the Rae Ave. <br />Easement had several cracks and roots in it. Tom's Backhoe dug up and repaired the <br />line on Nov. 17th and 18t'. <br />• Nov. 3`d, Lance and I did some jetting. <br />• Nov. 5th, Kurt and I jetted. <br />• Nov. 9th, Lance and I finished what was left of sewer jetting. Our annual jetting is now <br />complete. <br />• Nov. 17th, completed a draft of our Sanitary Sewer Maintenance Policy and Schedule. <br />Report Submitted By: Tina Nolden (Water/Wastewater Operator) <br />Please call me if you have any questions/comments. <br />`- 218 -568 -5604 or 218 - 820 -2125 <br />