My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.01 & 05.02 - Wildlife Tr/N Sluetter Improve-Public Hearing
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2010
>
12-07-2010 Council Meeting
>
05.01 & 05.02 - Wildlife Tr/N Sluetter Improve-Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2014 9:21:44 AM
Creation date
5/20/2014 9:11:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pequot Lakes <br />Wildlife Trail and North Sluetter Road Improvements <br />Preliminary Assessment Hearing <br />Tuesday, December 7, 2010, 6:00 p.m. <br />E. Assessment Approach <br />Costs for the project are divided between benefited property owners and <br />the City using policies established in the City of Pequot Lakes' <br />"Assessment Procedures and Policy ", adopted February 7, 2006, <br />including amendments made to the policy since that time. <br />Per this policy, 100% of the roadway improvement project costs for this <br />project are assessed to the abutting benefited property owners on a per <br />front foot basis. <br />However, as mentioned previously, the City Council has elected to <br />present this project on a per lot basis. <br />Wildlife Trail costs ................... ............................... $1941000 <br />Numberof Lots .................................... ............................... 16 <br />Cost per Lot ($194,000 / 15 lots) .............................. $12,125 <br />North Sluetter Road costs ......... ............................... $77,000 <br />Numberof Lots ...................................... ............................... 4 <br />Cost per Lot ($77,000 / 4 lots) ... ............................... $19,250 <br />Combined Projects costs ......... ............................... $271,000 <br />Numberof Lots .................................. ............................... 20* <br />Cost per Lot ($271,000 / 20* lots) ............................ $13,550 <br />* 1 lot actually has sides on both projects, could be 19 <br />In accordance with Minnesota Statutes, assessments can be paid in two <br />ways. <br />The first is to pay them in full to the City after adoption of the Final <br />Assessment by the City Council. No interest is charged. <br />The second is to pay them with your property taxes to the County in <br />equal per year installments over a period of time and at an interest rate <br />L.- determined by the City Council. <br />Page 6 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.