My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3(c) Conditional Use Permit "The Range" Resort Development LLC/Premier Homes
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2019
>
04-18-2019 Planning & Zoning Commisison Meeting
>
3(c) Conditional Use Permit "The Range" Resort Development LLC/Premier Homes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2019 8:38:05 AM
Creation date
4/12/2019 8:37:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staff Recommendation: If the Planning Commission wishes to recommend <br /> approval of the proposed conditional use permit and planned unit development, <br /> Staff recommends the following conditions of approval: <br /> On the conditional use permit and preliminary plat: <br /> i. Except as amended by these conditions, the development of the <br /> subdivision and planned unit development shall be in substantial <br /> conformance with the approved preliminary plat, site plan and elevations <br /> that govern the general location of lots, roadways, buffers, infiltration <br /> basins and improvements dated Apri18, 2oi9. <br /> 2. Prior to construction, excavation, grading or other terrain disturbance, <br /> final plans for all infrastructure (private roads, water system, etc.) and <br /> grading shall be submitted to and approved by the City Engineer. The <br /> improvements within the development shall be designed by a licensed <br /> engineer. <br /> 3. The 50-foot buffer around the perimeter of the planned unit development <br /> sha11 remain in a natural state in perpetuity, except for road access areas <br /> and SSTS components. The vegetation in the buffer shall not be altered <br /> except to create areas for SSTS tanks/drainfield(s) and road accesses. <br /> Structures may not be constructed in the buffer. <br /> 4. Lots i— i5 may only be developed with single family homes. <br /> 5. Lot i6 (greenspace) may not contain any structures. Vegetation located in <br /> Lot �6 shall substantially remain in a natural state. Vegetation may be <br /> removed from Lot i6 in order to construct trails, private roads, sewer <br /> system, and water system. Reference to these provisions shall be made in <br /> the development covenants. <br /> 6. A hydrant shall be installed off of the deep water well for fire protection. <br /> �. Ownership and long-term maintenance responsibilities/obligations for the <br /> community water system shall be described in the development covenants. <br /> 8. Ownership and long-term maintenance responsibilities/obligations for the <br /> sewer system shall be described in the development covenants. <br /> 9. The cluster sewer system shall conform to Minnesota Pollution Control <br /> Agency Standards (Chapter �080 — �083 of the Minnesota Administrative <br /> Rules) and the City of Pequot Lakes SSTS standards. The final plat shall <br /> not be signed until the final SSTS design is reviewed and approved by an <br /> Advanced Inspector per Minnesota Rules. <br /> io.The cluster water system shall conform to the Minnesota Department of <br /> Health Rules and Regulations MHD 2io-23o "Water Well Construction <br /> Code", and the cluster system shall receive the approval of the City <br /> Engineer. <br /> 1�. The city attorney shall review and approve the declaration, covenants, by- <br /> laws, etc.before the final plat is signed. <br /> �2. The developer shall pay a park dedication fee in the amount of$14,040.00 <br /> in accordance with Section i�-9.io "Dedication to the Public— Standards". <br /> (4i6 X 2.25 PPH = $936 X�g lots = $�4,040.). <br /> 13. Prior to the submission of a Final Plat application the applicant shall <br /> provide for the construction of the required improvements at their <br /> Pequot Lakes Staff Report 3(c)-22 <br /> April i8,2oi9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.