My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03.03A Trailside Park Project
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
01-22-2019 Special City Council Meeting
>
03.03A Trailside Park Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2019 11:52:57 AM
Creation date
1/16/2019 11:52:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
New Paricing Lat on the south side of Sibley Street=$175,000 <br /> Clarifiers:This impravement daes need to caordinate with storm drainage system improvemerKs and <br /> Sibley Street improvements. <br /> Watermain Replacemerrt under Sil�ley Street fi$100,QQ0 <br /> Clarffiers:Replace these before putting a new roadway on top.This cost does not include erosion <br /> control as some kind of roadway wo�lc(with erosion control)would be needed too. <br /> Sanitary Sewer Replacement under Sibley Street�$120,4� <br /> Ciarifters:Replace these before putting a new roadway on top.Tt�is cost doPs not include erosion <br /> control as some kind of roadway work(with erosion contran would be needed too. <br /> AgaPn,the above estimated wst breakdowns for different sets of improvements incorporate the full <br /> price of general bid items. It is challengirtg to try and take an"a ia carte"approach to splitting out <br /> different sets of improvemer�ts and correspondtng costs. <br /> Thank you, <br /> Tim Houle,PE <br /> Cfiril Engineer,VP <br />
The URL can be used to link to this page
Your browser does not support the video tag.