Laserfiche WebLink
From: T�m Houle(Tim.M.Houle�wsn.us.com] <br /> Sent: Tu�lay,Novemb�?J,20ia 3:54 PM <br /> Sub,�ec� Pequot Lakes C�t SpRts tor Stbley Str�et and'T�att�lde Park R�oad and Utllitles <br /> Impr+uvement� <br /> Nancy, <br /> At the Novembe�City Councfl meeting,the Council asked for some cost breakdowns for difFererrt�ts of <br /> improvements wlthtn the above Subject project to help them in budgeting. <br /> As a reminder for the City Council,only two bids were received back at the beginning of Au$ust�Young <br /> Excavating at abaut$691,000 and Aspen Construction Company at about$760,000). <br /> We took al1 the line items and tried to split out the approprtate quantities amongst all the different sets <br /> of improvements the Council mentioned.We used an average of the two bids to apply to the quantities <br /> in each sefi af improvements. <br /> For some of the"generaN'bid items(e.g.Mobilization;Wark Zone Traffic CoMrol,Erosion Control <br /> Supervisor),we did not split them amongst the different sets af improvements but instead used the <br /> average because they would be needed on each s�t of improvement. <br /> This will result in the sum of the total of each different set of improvements exoeeding the bids received <br /> (but ff you proceed with smaller proJects,and quantities,we will probably see higher unit p�ices). <br /> NOTE that the design of Sibley Street anticipated Patriot Avenue 6eing removed,and so the vertical <br /> profile grade of the proRased improved Sibley Street went`straighY over to Frorrt Street If just Sibley <br /> Street is improved in some manner,a new design will need to be perfonried,and a better wst estimate <br /> than the one below would neetJ to be prepared. <br /> Widening Government Drive on the west stde by 2 feet from Main Street to Sibley Street=$90,QOQ <br /> Clarifiiers:Two feet of existing pavement on the west side wauld be removed,widened by 2 feet,and 4 <br /> new feet of pavement put in so the pavemeM joirrt would avoid tire tracking.It also includes revisions to <br /> the bump out on the northwest corrte�of Main and Government. <br /> Sidewalk on the sfluth side of Main Street from Govemment Drive to Patriat Avenue=$80,000 <br /> Gaciflers:Includes some work around the existing trafflc control cabinet in the southeast comer of <br /> Patriot and Main. <br /> Stonr�drainage system on Sibley Street from Government Drive to Front Street�$105,000 <br /> Cla�ifiers:It will be challengin�just to put in a"storm drainage system"without a design and some <br /> roadway improveme�s.This cost does not include erasion cantrol as some kind of roadway work(with <br /> erosion control}would be needed too. <br /> Roadway improvements on Sibley Street from Governmetrt Drive to Front Street tt$240,OD0 <br /> Clarffiers:This includes new cur6 and�utter,new pavement,and new sidewalk.Due to keeping Patrtot <br /> Avenue,some kind of new desi�n and a better c�st estimate would need to be undertaken. <br />