Laserfiche WebLink
New Parking Lot on the south side of Sibley Street�$175,000 <br /> Clarifiers:This improvement does need to coordinate with storm drainage system improvements and <br /> Sibley Street improvements. <br /> Watermain Replacement under Sibley Street�$100,000 <br /> Clarifiers: Replace these before putting a new roadway on top.This cost does not include erosion � <br /> control as some kind of roadway work(with erosion control)would be needed too. <br /> Sanitary Sewer Replacement under Sibley Street=$120,000 <br /> Clarifiers: Replace these before putting a new roadway on top.This cost does not include erosion <br /> control as some kind of roadway work(with erosion control)would be needed too. <br /> Again,the above estimated cost breakdowns for different sets of improvements incorporate the full <br /> price of general bid items. It is challenging to try and take an "a la carte"approach to splitting out <br /> different sets of improvements and corresponding costs. <br /> Thank you, <br /> Tim Houle, PE <br /> Civil Engineer,VP <br />