My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.01 A-D Budget/Levy Public Hearing
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2018
>
12-04-2018 City Council Meeting
>
05.01 A-D Budget/Levy Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 11:26:45 AM
Creation date
11/29/2018 11:26:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
New Parking Lot on the south side of Sibley Street�$175,000 <br /> Clarifiers:This improvement does need to coordinate with storm drainage system improvements and <br /> Sibley Street improvements. <br /> Watermain Replacement under Sibley Street�$100,000 <br /> Clarifiers: Replace these before putting a new roadway on top.This cost does not include erosion � <br /> control as some kind of roadway work(with erosion control)would be needed too. <br /> Sanitary Sewer Replacement under Sibley Street=$120,000 <br /> Clarifiers: Replace these before putting a new roadway on top.This cost does not include erosion <br /> control as some kind of roadway work(with erosion control)would be needed too. <br /> Again,the above estimated cost breakdowns for different sets of improvements incorporate the full <br /> price of general bid items. It is challenging to try and take an "a la carte"approach to splitting out <br /> different sets of improvements and corresponding costs. <br /> Thank you, <br /> Tim Houle, PE <br /> Civil Engineer,VP <br />
The URL can be used to link to this page
Your browser does not support the video tag.