From: Tim Houle [Tim.M.Houle@wsn.us.com] <br /> Sent: Tuesday, November 27, 2018 3:54 PM <br /> Subject: Pequot Lakes Cost Splits for Sibley Street and Trailside Park Road and Utilities <br /> Improvements <br /> Nancy, <br /> At the November City Council meeting,the Council asked for some cost breakdowns for different sets of <br /> improvements within the above Subject project to help them in budgeting. <br /> As a reminder for the City Council,only two bids were received back at the beginning of August(Young <br /> Excavating at about$691,000 and Aspen Construction Company at about$760,000). <br /> We took all the line items and tried to split out the appropriate quantities amongst all the different sets <br /> of improvements the Council mentioned.We used an average of the two bids to apply to the quantities <br /> in each set of improvements. <br /> For some of the"general" bid items(e.g. Mobilization;Work Zone Traffic Control, Erosion Control <br /> Supervisor),we did not split them amongst the different sets of improvements but instead used the <br /> average because they would be needed on each set of improvement. <br /> This will result in the sum of the total of each different set of improvements exceeding the bids received <br /> (but if you proceed with smaller projects,and quantities,we will probably see higher unit prices). <br /> NOTE that the design of Sibley Street anticipated Patriot Avenue being removed,and so the vertical <br /> profile grade of the proposed improved Sibley Street went'straighY over to Front Street. If just Sibley <br /> Street is improved in some manner,a new design will need to be perFormed,and a better cost estimate <br /> than the one below would need to be prepared. <br /> Widening Government Drive on the west side by 2 feet from Main Street to Sibley Street�$90,000 <br /> Clarifiers:Two feet of existing pavement on the west side would be removed,widened by 2 feet,and 4 <br /> new feet of pavement put in so the pavement joint would avoid tire tracking. It also includes revisions to <br /> the bump out on the northwest corner of Main and Government. <br /> Sidewalk on the south side of Main Street from Government Drive to Patriot Avenue=$80,000 <br /> Clarifiers: Includes some work around the existing traffic control cabinet in the southeast corner of <br /> Patriot and Main. <br /> Storm drainage system on Sibley Street from Government Drive to Front Street=$105,000 <br /> Clarifiers: It will be challenging just to put in a "storm drainage system"without a design and some <br /> roadway improvements.This cost does not include erosion control as some kind of roadway work(with <br /> erosion control)would be needed too. <br /> Roadway improvements on Sibley Street from Government Drive to Front Street=$240,000 <br /> Clarifiers:This includes new curb and gutter, new pavement,and new sidewalk. Due to keeping Patriot <br /> Avenue,some kind of new design and a better cost estimate would need to be undertaken. <br />