My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.01 - Engineering Services Proposal for N Sleutter Rd
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2010
>
09-07-2010 Council Meeting
>
10.01 - Engineering Services Proposal for N Sleutter Rd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 11:37:17 AM
Creation date
5/12/2014 11:33:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
September 1, 2010 <br />Pequot Lakes <br />North Sluetter Road Improvements Study Proposal <br />Page 2of3 <br />As was stated in our Wildlife Trail study proposal, our efforts to assist the City in the preliminary <br />special assessment hearing slated for your December meeting are outside the scope of the <br />study. We can assist the City staff in preparing notices (the City would get the notice to the <br />newspaper and would mail out notices to property owners). We would prepare a handout / <br />presentation for,the preliminary special assessment hearing, and we would present at the <br />hearing and be available to assist during the question and answer period. The estimated fee for <br />these services (depends on the level of assistance needed) would be $950. <br />We recommend a separate meeting (maybe before your regular City Council meeting) for <br />special assessment hearings — they can take an hour depending on the level of public input / <br />questions. <br />Also, we recommend that the City Council discuss, and if possible, tentatively select an initially <br />preferred special assessment approach before December. We can then focus our presentation <br />around this approach (too many options can confuse people). <br />After the preliminary special assessment hearing, should the City want to move forward, we <br />would prepare a proposal for the City's consideration that would include field survey; design, <br />bidding, and construction phase assistance; and final assessment hearing assistance. <br />If you are in agreement with our proposed scope of services, please initial as appropriate, sign <br />below, and return one copy of this letter to us as our authorization to proceed. We appreciate <br />the opportunity to serve the City. <br />WIDSETH SMITH NOLTING <br />Timothy . Houle, P.E. <br />c: Mike Rude, WSN <br />WSN File <br />Encl. 2010 Fee Schedule <br />General Provisions of Professional Services Agreement <br />J: \MKTG\Proposals\2010 Proposals \ — Letter Proposals \Pequot Lakes - North Sluetter Road Feasibility Study - <br />20100901.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.