Laserfiche WebLink
M <br />September 1, 2010 <br />The Honorable Mayor and City Council <br />City of Pequot Lakes <br />4368 County Road 11 <br />Pequot Lakes, MN 56472 <br />RE: Engineering Services Proposal <br />North Sluetter Road Improvements Study <br />Dear Mayor and Members of the Council: <br />Brainerd I Baxter <br />7804 Industrial Park Road <br />PO Box 2720 <br />Baxter, MN 56425 -2720 <br />Tel: 218- 829 -5117 <br />Fax: 218 - 829 -2517 <br />As directed by the City Council at their August 3rd, 2010 meeting, we propose to study and <br />prepare a feasibility report for improvements to North Sluetter Road from County Road 168 on <br />the south to the intersection with Wildlife Trail on the north. <br />Following are our proposed scope of services: <br />• Confirm with Mike Loven that the existing ditch conditions are such that little or no <br />drainage improvements are necessary, and that the width is such that little or no <br />widening is necessary. <br />• Calculate estimated quantities for the appropriate improvements using aerial <br />photography maps from the County's GIS website or plat maps. <br />• Calculate estimated construction and project costs. <br />• Lay out a few special assessment scenarios, some of which would include a combined <br />project with proposed Wildlife Trail improvements. <br />• Prepare a letter report briefly discussing existing conditions (aerial photography maps <br />from the County's GIS website or plat maps being an exhibit), possible and proposed <br />improvements, estimated project costs, estimated special assessments, and conclusions <br />and recommendations on next steps. <br />Our effort to perform the above services will be a not -to- exceed fee of $1,825. <br />We can complete the above services within 30 days of your authorization to proceed. <br />Sometimes it is beneficial to list what our services do not include. If the City Council changes <br />something such that the report needs to be adjusted, we would update the report as an <br />additional service based on our attached hourly billing rates. <br />Please note that our above services do not take advantage of a field survey. While we would <br />save on this cost at this stage, a field survey does provide much better information from which <br />better proposed cost estimates can be derived. It is a type of risk — reward decision. <br />engineering I architecture I land surveying I environmental services <br />