My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Water Wastewater Monthly Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2010
>
09-07-2010 Council Meeting
>
09 - Water Wastewater Monthly Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 11:35:10 AM
Creation date
5/12/2014 11:33:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wastewater Dept. <br />I. Facility Performance: <br />a. CBOD Concentration <br />Influent — 311 mg/1 (No Design Listed) <br />Effluent — mg/1 <br />b. TSS Concentration <br />Influent — 286 mg/1 (No Design Listed) <br />Effluent — mg/1 <br />c. Effluent Fecal Coliform — 38 <br />Permit Condition — 200 organisms /100 ml <br />d. Flow - Average Daily Flow — 58,000 gallons (Design — 121,795 gal/day) <br />Maximum Daily Flow — 70,000 gallons <br />Minimum Daily Flow — 49,000 gallons <br />Total Monthly Flow — 1,390,000 gallons (As of the 24th) <br />II. Oaerations and Maintenance: <br />• The monthly MPCA Discharge Monitoring Report (DMR) was completed and <br />`- submitted. <br />• Aug 12th, while doing daily manhole checks, noticed manhole in front of Thurlow's was <br />backed up, along with the next two manholes. Lance and I jetted from the north end of <br />Pestello's all the way to Tower Square. Then, from manhole at Pro -Build up to manhole <br />at Pestello's. Broke up a large chunk of grease in the lines. <br />• Aug 14th around 8 pm, got called out to PRASD's lift station on Chickamaw Beach <br />Road. Power outage caused by a fallen tree on power line. Power Company took care of <br />the problem right away. <br />• Aug 170, collected pond samples and quarterly influent sample and mailed to NTS. <br />• Aug 18th around 6 am, got called out to PRASD. Received a couple different alarms due <br />to a short power failure. Not sure what had caused it. <br />• Aug 20th around 2:30 am, got called out to PRASD's main lift station. Pulled all three <br />pumps and removed debris (rags) from the impellers and volutes. <br />• Also on the 20th, weed - trimmed around ponds and monitoring wells. Started pulling <br />weeds from pond dikes. <br />• Aug 24th, had three of our "dirtiest" lift stations thoroughly cleaned by Fyle's and <br />NorthStar Pump. They removed a lot of grease and sand, a few rocks, and several small <br />pieces of clay -tile pipe. We really need to have all our sewer mains televised to find <br />where these pieces are coming from. As well as knowing where all services stub in. <br />Report Submitted By: Tina Nolden (Water/Wastewater Operator) <br />Please call me if you have any questions /comments. <br />218 -568 -5604 or 218 - 820 -2125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.