My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.01 - Resolution Receiving Feasibility Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2010
>
08-03-2010 Council Meeting
>
10.01 - Resolution Receiving Feasibility Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2014 9:48:41 AM
Creation date
4/28/2014 9:47:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ESTIMATED PROJECT COSTS <br />Estimated costs for the proposed improvements are as follows: <br />Construction Cost $ 149,000 <br />Contingency (10 %) $ 15,000 <br />Engineering, Legal, Funding, and Administration (20 %) $ 30,000 <br />Project Total $ 194,000 <br />A detailed breakdown of the estimate is provided in the Appendix. <br />The costs estimated herein are intended to convey a general and approximate picture of the <br />costs that would probably be incurred today in carrying out the proposed work. <br />Costs can vary widely depending upon many factors such as the actual final design, weather, <br />economic conditions, soil and ground water conditions, size of project, and the workload of <br />available contractors. <br />Actual costs can only be determined by bidding the project. <br />WSN No. 013060044.000 <br />Pequot Lakes —Wildlife Trail Improvements Study <br />Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.