Laserfiche WebLink
`- To summarize, the proposed improvements for Wildlife Trail include the following: <br />OR <br />• 2 -inch thick 18 -foot and 16 -foot wide paved surfaces <br />• Approximate 2 -inch thick "sweetening" of Class 5 aggregate base <br />• 1 -foot wide Class 5 aggregate shoulders <br />• Bituminous gutters on either side of sags / low points <br />• Use of the existing roadbed <br />• Minimal clearing and roadway ditches where necessary to accommodate <br />drainage <br />o Erosion control during construction <br />o Minimal turf restoration <br />Pequot Lakes - Wildlife Trail Improvements Study <br />WSN No. 0130130044.000 Page 8 <br />