Laserfiche WebLink
�,r <br /> __._ _._ _ _ ___ _____ _ . _ <br /> �,,�. � ` �--- Paul joined WSN in 2016 after completing a master's degree in civil and environmental <br /> � � engineering. He has experience working on hydrological studies, storm water pollution <br /> __ <br /> � - prevention, environmental impact studies, effluent and waste assessments, and wetland <br /> j� delineations. As an environmental engineer, Paul is primarily responsible for hydrologic <br /> �� � modeling, environmental reporting, and pollution control and countermeasure plans. He also <br /> assists the environmental department with wetland delineations. Recently, he has completed <br /> work on several environmental assessment worksheets, welihead protection plans, and an <br /> _ : : Alternative Urban Areawide Review. <br /> NCEES Engineer-in-Training <br /> 40-Hour OSHA HAZWOPER 3 � <br /> Training • Water Supply Plan—Pine Island, MN • Spill Response Plan—Glenwood, MN <br /> • Water Supply Plan—Baxter, MN � Spill Prevention Control&Countermeasure Plan <br /> • Welihead Protection Plan—Isle, MN <br /> » Hermantown, MN <br /> Master of Science, Environmental . Wellhead Protection Plan—Pine • TH 200 Wetland Delineation—Walker, MN <br /> Engineering/University of Island, MN • Stormwater Pollution Prevention Plan <br /> California, Los Angeles, 2015 . Phase I Environmental Site Assessment » Brainerd, MN <br /> Bachelor of Science, Natural Baudette, MN » Baxter, MN <br /> » <br /> Resources&Environmental » Minneapolis, MN <br /> Science/University of Illinois » Rochester, MN <br /> Urbana-Champaign, 2014 » Deerwood, MN <br /> » Kelliher, MN <br /> » Monticello, MN <br /> � <br /> � ° <br /> ' E'�/ �(��,'t'�PI'1. ��� <br /> � �,,�. ,,�-,-�n�,-,� +a; �����,-, <br /> � ,r Joey Goeden joined WSN in 2013. His responsibilities include wetland delineations, Phase I <br /> "'�� �' Environmental Site Assessments and Wildlife Surveys. He has worked on delineation projects <br /> � �`� that have ranged in size from less than five acres to several hundred acres. The projects <br /> � <br /> '� � have included most of Minnesota's wetland and vegetation types. He is experienced in <br /> �`,I '""��"'r�{r GPS equipment and techniques. He has experience writing environmentai documents such <br /> �,� as Wetland Delineation Reports, Wetland Monitoring Reports, Phase I Environmental Site <br /> �'' " "` "'` Assessments, Environmental Assessments and Environmental Impact Statements. <br /> Wetland Delineator Certified: MN <br /> (1311) • Bemidji Regional Event Center Wetland • Excelsior Road and Edgewood Drive <br /> Monitoring—Bemidji, MN Improvements,Wetland Delineation—Baxter, <br /> Bachelor of Science, Natural <br /> � CSAH 58 Wetland Delineation—Outing, MN MN <br /> Resource Management� North • Dellwood/Novotny Wetland Delineation— • Nelson Drive Improvements, Wetland <br /> Dakota State University, 2013 Baxter, MN Delineation—Deerwood Township, MN <br /> • Essentia Health Phase I ESA—Pequot Lakes, ' MnDOT TH 200 Wetiand Delineation TH 200/ <br /> MN Wetland Certification TH 371 Intersection East to TH 200/TH 84 <br /> Program, 5-Day Basic Wetland MN Intersection—Shingobee,Turtle Lake, Pine Lake <br /> Delineation Course • Essentia Health Phase I ESA—Crosslake, MN and Kego Townships, MN <br /> MN Wetland Certification • Isle Drive Wetland Delineation—Baxter, MN . MnDOT TH 38 Wetland Delineation, Pughole <br /> Program, Basic Plant • Inglewood Drive Wetland Delineation—Baxter, �ake to Marcell—Deer Lake and Marcell <br /> Identification Course MN Townships, MN <br /> HalfMoon Education Inc., • TH 38 Wetland Delineation—Marcell, MN • North Koochiching Sanitary District Treatment <br /> Minnesota Wetlands�aw& Facility Upgrade EAW <br /> Compliance <br /> Pequot Lakes-Heart of The Good Life Development Widseth Smith NoRing� <br />