I Key Personnel
<br /> i, !P -
<br /> IIr +,4 � . ` . -. - �. " .. _ _- - ._. � -.
<br /> Chad joined WSN in 1996 and is currently the Director of Survey Operations in the Brainerd/
<br /> t Baxter office. Chad coordinates work assignments with the schedule of the client to ensure
<br /> � ` , ���; timely completion of projects. His training as a Certified Federal Surveyor has given him the
<br /> � expertise to properly evaluate evidence and provide important solutions for projects in many of
<br /> � 5��" WSN's offices. His responsibilities include land survey project development and management,
<br /> �` scheduling, and coordination.
<br /> Professional Land Surveyor. • Potlatch Baxter Shovel Fieady Application— • 2013 Water and Street Improvements—
<br /> MN (41643), IL(3887) Baxter, MN Swanville, MN
<br /> Certified Federal Surveyor • Nature Conservancy Surveys—Morrison • Poplar Avenue Street Improvements—
<br /> (CFedS)(1292) Counry, MN Nisswa, MN
<br /> • TPC Surveys 293B2331,2336 • Aitkir Airport Improvements—Aitkin, MN
<br /> • Inglewood Drive and Clearwater Road • Minnesota Avenue Reconstruction—Aitkin, MN
<br /> Bachelor of Science, Land ' Improvements, SAP 230-105-02 and 230-107-
<br /> Surveying and Mapping j St. 01—Baxter, MN � Bunker Hill Drive—Aitkin, MN
<br /> Cloud State University, 2000 • Aitkin County Growth Bolster Property—
<br /> • Aitkin County CSAH 12 Topographic Survey Aitkin, MN
<br /> Diploma, Civil Engineering 116B0014
<br /> Technology� St Cloud Technical � Crosslake Street Improvements—
<br /> College, 1994 • Aitkin County Growth Surveys 293B2310; Crosslake, MN
<br /> 293B2101
<br /> • Aitkin County Growth Airport Drive Layout ' Water Improvements Preliminary Engineering—
<br /> Crosby, MN
<br /> • Aitkin County/Hazleton Township state park . 1 st Street NW Improvements—Crosby, MN
<br /> road survey
<br /> , ,:.. _ „�.
<br /> .��,.�� P��� ���- ,,, _
<br /> — �> ,-,�7� -�;�r- � ,_, ���-�
<br /> .__ __ _._ __ __ ___ _ __ __
<br /> Tony joined WSN in early 2014 with five years of experience in construction. He has expanded
<br /> .,:�
<br /> his experience to include design for public and private engineering projects including
<br /> � roadways, storm water management systems, and lot development plans. He conducts field
<br /> — inspections, interprets design criteria, develops and reviews site plans and designs, develops
<br /> special provisions for construction, and coordinates plans and designs with clients. He is
<br /> responsible for design of an array of civil engineering projects, including new subdivisions, lot
<br /> and bullding layouts, water and sewer systems, wastewater treatment systems, storm sewers,
<br /> - and street and highway improvements.
<br /> Engineer-in-Training: Minnesota
<br /> MnDOT Certification (18916):
<br /> • Bituminous Street Level I &II ' Aitkin County Growth Bolster Property— • Whitebirch Village SWPPP Update and Permit
<br /> • Grading&Base Levei I Aitkin, MN Application—Breezy Point, MN
<br /> • Aggregate Production • Baxter Drive-Charles Street Trail Connection— • Thumper Pond RV Park Design—Ottertaii, MN
<br /> MN Erosion/Sediment Control B�er, MN • Robert Roth Foundation System and Retaining
<br /> Specialist: Design Construction • Clark Drive Water Extension—Verndale, MN Wall—Nisswa, MN
<br /> SWPPP • Edgewood Drive Storm Study—Baxter, MN • Drainage Improvements—Lake Shore, MN
<br /> • Nystrom Associates Clinic—BaYter, MN
<br /> Bachelor of Science, Civil • Wildflower Drive, Franklin Drive and Woida
<br /> Engineering � Universiry of Road Design and Construction—Baxter, MN
<br /> Minnesota-Duluth, 2013
<br /> • 2013 Lower Site Concept Design—
<br /> Brainerd, MN
<br /> • Wagidaaki Road Improvements—Onamia, MN
<br /> � Widseth Smith Nolting Pequot Lakes-Heart of The Good Life Development
<br />
|