My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01 Water Plant Process Control System Upgrade
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2018
>
06-05-2018 City Council Meeting
>
09.01 Water Plant Process Control System Upgrade
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2018 8:51:15 AM
Creation date
6/1/2018 8:51:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Spring Lake Engineering P.A. will begin work on this project upon authorization with the goal of <br /> completing all upgrades during the winter of 2019. <br /> F. COST <br /> Estimated Project Cost: <br /> . <br /> Option 1:All new PLC's and Input/Output Modules $76,759 <br /> Option 2: Merge Filter and Main PLC's,and reuse existing Input/Output Modules $63,508 <br /> Pequot Lakes Proposal-Upgrade.doc Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.