My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01 Water Plant Process Control System Upgrade
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2018
>
06-05-2018 City Council Meeting
>
09.01 Water Plant Process Control System Upgrade
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2018 8:51:15 AM
Creation date
6/1/2018 8:51:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
d. Review alarms with PRASD <br /> e. Program Alarm Dialer on the SCADA server to perform dial out <br /> f. Provide and install Rockwell programming software for the PLC's <br /> g. Configure VNC Viewer,Team Viewer,or equal for remote access <br /> 5. Hardware and Electrical Installation <br /> a. Main Control Panel <br /> i. Allen Bradley Compactlogix L33 PLC(note,supports 16 cards) <br /> ii. PLC power supply 1769-PA4 <br /> iii. Digital input card 1769-IQ16(1} <br /> iv. Digital input card 1769-IA16(2) <br /> v. Digital output cards 1769-0W16(3) <br /> vi. Analog input card 1769-IF8(2) <br /> vii. CatSe Cable <br /> viii. Wire <br /> ix. Cmore 12" HMI (Human Machine InterFace)—replaces existing PanelView <br /> x. Remove old equipment <br /> xi. Install new PLC equipment <br /> xii. Start up and testing <br /> b. Filter Panel and Water Tower Panel upgrade <br /> i. Allen-Bradley MicroLogix 1400 PLC(2) <br /> ii. Allen-Bradley MicroLogix analog input cards(2) <br /> iii. Allen-Bradley MicroLogix Digital input card <br /> iv. Allen-Bradley MicroLogix Digital relay output card <br /> v. Cmore 12" HMI (Human Machine InterFace)—replaces existing PanelView <br /> vi. Ethernet Switch 5 port <br /> vii. Ethernet Cables <br /> c. Router for VPN (remote access) <br /> d. Relays(2) <br /> e. Uninterruptible Power Supply(UPS) unit(2) <br /> f. Terminal Blocks <br /> g. Power supply 24 volt <br /> h. Radio Systems <br /> i. Ethernet Radios 900MHZ(2) <br /> ii. Antennas(2) <br /> iii. RF cable and ends <br /> iv. RF lightning arrestors(2) <br /> i. Personal Computer Dell Optiplex <br /> j. Windows 10 Operating system <br /> k. Microsoft Office STD <br /> I. Wonderware InTouch SCADA Software update <br /> m. Win911 Interactive DialerSoftware <br /> n. Installation,Configuration,Start up and Calibration <br /> o. Documentation <br /> p. Testing,training and commissioning <br /> q. One year warranty on supplied equipment <br /> Pequot Lakes Proposal-Upgrade.doc Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.