My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4(b) Utilities and Roadway Extensions Study
Laserfiche
>
Economic Development (Permanent)
>
EDC Agenda Packets
>
2018
>
05-15-2018 EDC Meeting
>
4(b) Utilities and Roadway Extensions Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 12:35:50 PM
Creation date
5/15/2018 12:35:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 24, 2018 WIDSETH <br /> Proposal for S.of Derksen Rd Study SMITH <br /> Cily of Pequot Lakes <br /> �9e 2 of 2 NOLTING <br /> WSN propos�to pe�FoRn the services described abave on an houriy basis, in ar.co�iance witl� <br /> the attached fee schedule.for an estlmated amount of�6,900. <br /> The timing of the completion of this Study will be depertdent on input and timing from the EDC. <br /> However.we tntend to provide the EDC with a draft of this Study within 45 days from approval <br /> of this proposal. <br /> We nealize this is an important future endeavor of the Clty and welcome the opportunity to sit <br /> down with you, Staff.or the EDC to review this proposal. <br /> We thank you for giving us the opportunity to submit this pr�oposal. If you are In agreemerrt with <br /> our proposed scope of services, please sign and retum one copy of this letter to us as our <br /> authorization to proceed.We look forvvard to working wlth you. <br /> Wldseth,Smith Nolting <br /> ��/ �, <br /> / � <br /> ✓������ <br /> Tmothy M. Houle, P.E. <br /> Clvil Engineer�Vice-President <br /> Attachments: General Provislons of Professional Servlces Agreement <br /> 2018 WSN Fee Schedule <br /> c: WSN File <br /> ........................................................................................................................................................... <br /> Accepted by the C/ty of Pequat Lakes: The above proposal is satlsfadory and WSN is <br /> authorized to do the work as specfied and in accordance with the attached General Conditions. <br /> Payment will be made monthly in acxordance with the terms on the attached fee schedule. <br /> Na nc y /-t� �"�d a rvl� Mavor <br /> Printed Na e—Nancy Adams TiUe <br /> �Q.�.e�.G Cd �,��� ,��-� � <br /> Signature Date <br /> z';n c�,� /`,�u �e c�i� Adminishatod6le#-- <br /> Printed Name—Nancy Malecha Tide <br /> -�''�:�_�. 'i'``�+`a . 9-2-/8 <br /> Signature �� Date <br /> N:�naerken�oe��ono�s�oo�ner Pm�s�2o�e�e�r Proposa�tPeauo��aicea-s�oer�sen unnees�a aoadway�t stuay.d«� <br />
The URL can be used to link to this page
Your browser does not support the video tag.