My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.01 Utilities and Roadway Extensions Study
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2018
>
05-01-2018 City Council Meeting
>
10.01 Utilities and Roadway Extensions Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2018 10:43:22 AM
Creation date
4/26/2018 10:43:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
April 24, 20�8 WIDSETH <br /> Proposal for S. of Derksen Rd Study SMITH <br /> City of Pequot Lakes <br /> Page 2 of 2 NOLTING <br /> WSN proposes to perform the services described above on an hourly basis, in accordance with <br /> the attached fee schedule,for an estimated amount of$6,900. <br /> The timing of the completion of this Study will be dependent on input and timing from the EDC. <br /> However, we intend to provide the EDC with a draft of this Study within 45 days from approval <br /> of this proposal. <br /> We realize this is an important future endeavor of the City and welcome the opportuniiy to sit <br /> down with you, Staff, or the EDC to review this proposal. <br /> We thank you for giving us the opportunity to submit this proposal. If you are in agreement with <br /> our proposed scope of services, please sign and retum one copy of this letter to us as our <br /> authorization to proceed.We look forward to working with you. <br /> Widseth mith Nolting <br /> / ' ��. �� <br /> . ��� <br /> Timothy M. Houle, P.E. <br /> Civil Engineer� Vice-President <br /> Attachments: General Provisions of Professional Services Agreement <br /> 2018 WSN Fee Schedule <br /> c: WSN File <br /> ........................................................................................................................................................... <br /> Accepted by the City of Pequot Lakes: The above proposal is satisfactory and WSN is <br /> authorized to do the work as specified and in accordance with the attached General Conditions. <br /> Payment will be made monthly in accordance with the terms on the attached fee schedule. <br /> Mavor <br /> Printed Name—Nancy Adams Title <br /> Signature Date <br /> Administrator/Clerk <br /> Printed Name—Nancy Malecha Title <br /> Signature Date <br /> N:\Marketlng DepflProposais100 Letter Proposals�2018 Letter Proposals�Pequot Lakes-S of Derksen UUiitles end Roadway Ext Study.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.