Laserfiche WebLink
assessment of all of the systems on their lakes. Numerous systems were upgraded to comply with minimum state <br /> standards due to their effort. <br /> The City has only limited storm sewer facilities.These were almost all ad-hoc repairs installed in reaction to acute <br /> problems that had developed. As the City continues to grow and development patterns become even more <br /> intense, there will be a need for aggressive stormwater management. Some of this management may be able to <br /> happen on individual sites,although most of it will need to be done by the City. <br /> Pequot Lakes is blessed to be the home of some major telecommunications companies. High speed internet is <br /> available throughout the City, as is telephone and cable for television. Cellular service wanes in some areas, <br /> although there is service throughout the main corridors. The availability of natural gas has been a boom for <br /> residential development. Due to its location along Highway 371, Pequot Lakes will likely always be ahead of other <br /> rural communities in privately-supplied modern infrastructure. <br /> POLICIES <br /> The following policies are proposed to guide all future infrastructur�related decisions in Pequot Lakes: <br /> Municipal utility systems must be fscally managed like a private utility, minus the profit margin. Public <br /> utilities need to operate in the same manner as private utilities. They need ta maintain the current system and <br /> level of service while financially planning ahead for repairs or replacement of system components.While the public <br /> is typically understanding of minor annual rate increases from private utilities (phone, cable, gas and elertric), <br /> elected officials are often reluctant to consider rate increases, equating them with tax increases. Periodic rate <br /> adjustments that reflect the real cost of running and maintaining these systems are necessary. The City cannot <br /> allow maintenance liabilities to be unfunded and passed on to future residents and businesses. <br /> The long-term ezpense of infrastructure ezpansion and the corresponding assumptions for induced growth <br /> and enhanced taz base need to be evaluated prior to every project that adds new infrastructure for tazpayers <br /> to maintain.Infrastructure projects in Pequot Lakes have historically been done on a"cash flow" basis,where the <br /> City evaluates the impact to the levy from paying its portion of a given project. When projects are funded with <br /> outside dollars (grants, low interest loans or direct private-sector investment in a project),the City has generally <br /> not calculated the long-term obligations of infrastructure maintenance, instead focusing on the potential near- <br /> term gains from increased property tax base.As our current infrastructure completes its initial life cycle,projected <br /> maintenance costs—which are typically a City obligation—are growing to unaffordable levels. Before additional <br /> obligation is added,it is critical that the City understand the entire cost it is committing to. <br /> Public sector investments need to be aligned with private sector investments,and vice-versa,to mazimize the <br /> local return on investmen�The City of Pequot Lakes has made its largest investments, and has its greatest <br /> commitments for infrastructure maintenance,in the traditional neighborhoods of downtown Pequot Lakes and the <br /> Business Park. Over the past two decades, private sector investments have tended to be outside of these areas, <br /> with residential construction happening on lakes and greenfield sites and commercial investments taking place <br /> along the TH 371 corridor. This mismatch in public/private investment wastes valuable public and private <br /> resources. <br /> When infrastructure systems are being maintained,the City must consider whether or not the infrastructure <br /> should be enhanced or scaled back based on the anticipated level of development that it serves. There are <br /> areas in the City, particularly in the downtown, where modest amounts of additional enhancement as part of a <br /> rehabilitation project would create a platform for additional private sector investment (e.g. Taking savings from <br /> Comprehensive Plan Update—February 2013 43 � P a g e <br />