My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Public Works Monthly Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2010
>
02-01-2010 Council Meeting
>
09 - Public Works Monthly Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2014 9:56:15 AM
Creation date
4/17/2014 9:53:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
`.. <br />Wastewater Dept. <br />I. Facility Performance: <br />a. CBOD Concentration <br />Influent — 346 mg /1 (No Design Listed) <br />Effluent — mg /1 <br />b. TSS Concentration <br />Influent — 272 mg /1 (No Design Listed) <br />Effluent — mg /I <br />c. Effluent Fecal Coliform Geometric Mean — No Effluent Flow <br />Permit Condition — 200 organims /100 ml <br />d. Flow - Average Daily Flow — 63,000 gallons (Design — 121,795 gal /day) <br />Maximum Daily Flow — 73,000 gallons <br />Minimum Daily Flow — 52,000 gallons <br />Total Monthly Flow — 1,502,000 gallons (as of the 25th) <br />I1. Operations and Maintenance: <br />• The monthly MPCA Discharge Monitoring Report was completed and submitted as <br />required. <br />• Jan. 4` ", tenants at 3851 West Grove Street asked to run their water continuously to <br />avoid any sewer freeze -ups. They had multiple problems last year due to the terrible <br />cold and a shallow sewer line. All water usage is recorded. <br />• Jan. 6`", Brad with Northern Water Works trouble - shooted our grinder pump at the <br />WTP. Unfortunately, the pump has been damaged due to improper voltage going to the <br />pump. He recommended having a booster panel installed to avoid future problems. He <br />gave us a loaner pump and took ours to their shop to be serviced. Karl Moon with <br />Moonlighting Electric came out the same day and reviewed our situation to put together <br />a quote for the installation of a booster panel. <br />• Jan. 6'h, registered for a CSWEA /MWOA (Central States Water Environment <br />Association/MN Wastewater Operators Association) Innovative Wastewater <br />Conference held on Feb. 23rd in St. Cloud. <br />• Jan. 21 s`, two of Karl Moon's employees installed the booster panel at the WTP. Karl's <br />waiting for a couple other parts, and when they arrive he will be able to finish the <br />connection to the grinder -pump panel and I will be able to use my restroom again! <br />Report Submitted By: Tina Nolden (Water /Wastewater Operator) <br />Please call me if you have any questions /comments. <br />218 -568 -5604 or 218- 820 -2125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.