Laserfiche WebLink
Offi ce E a rn i n g s Tuesday,December 26,2017 <br /> 9:09:10 AM <br /> Widseth Smith Nolting&Assoc.,Inc. For the period 12/1/2017-12/31/2017 <br /> Budget Status Report - Pequot Lakes - Maint. Facility Final Design, Bidding, Constr. <br /> Job-to-Date Contract Total �! Job-to-Date Spent Total _ Job-to-Date Total Billed <br /> �5,00o poo°° This is the last phase of the Maintenance Building project. <br /> �'' It includes final design, bidding, and construction phase services. <br /> ��� <br /> �o,000 The design occurred in 2017 and will conclude with construction in 2018. <br /> � .�� � �;.,; �� <br /> 65,000 It appears we are on budget at this point in time, but a lot of questions <br /> can impact the budget. <br /> � <br /> `—° so,000 How the bids come in, and which Contractor will be the low bidder can <br /> o make an impact on how much time we really need to spend during <br /> construction. <br /> 55,000 � �� � � �"� � � ,�a�` <br /> h�' <br /> 50,000 �� . � � �: .� �. � <br /> 0 <br /> �yo <br /> m <br /> 45,000 <br /> Maintenance Dept. Facility <br /> Project Name <br /> Show Contract Contract Contract Contract Spent Spent Spent Spent Total Total Spent <br /> Unposte Labor Consultant Expenses Total Labor Consultant Expenses Total Billed Received Hours <br /> d <br /> Project Number:013060063.000 Maintenance Dept.Facility <br /> JTD 73,400.00 73,400.00 53,757.75 41.10 53,798.85 45,875.00 42,205.00 461.25 <br /> v7.6.717(0078)- Billing,Project Budgeting,Show Unposted Page 1 of 1 <br />