Laserfiche WebLink
Off i ce E a rn i n g s T�esdaY,December 26,2017 <br /> 9:10:14 AM <br /> Widseth Smith Nolting�Assoc.,Inc. For the period 12/1/2017-12131/2017 <br /> Budget Status Report - Pequot Lakes - MnDOT Master Utility Agreement <br /> Job-to-Date Contract Total Job-to-Date Spent Total — Job-to-Date Total Billed <br /> 30,000 <br /> 0o This is the Master Utility Agreement project with MnDOT on relocating <br /> ryyh°°� the City's forcemain out to the Wastewater Treatment Facility (VWVTF). <br /> 25,000 <br /> The bulk of the construction work occurred in 2016, and the paperwork <br /> ' assistance was concluded in 2017. <br /> 20,000 <br /> �' Construction went more smoothly than anticipated, which was one factor <br /> � <br /> o in minimizing our time and assistance and coming in under budget. We <br /> � 15,00o u were also able to navigate MnDOT's paperwork process more efficiently <br /> '� ` than anticipated. <br /> �o,000 �° �° <br /> ��° �,a°' <br /> a, �, <br /> �3s <br /> 5,000 . .. . , .�,� _, . � .. <. ...: ; <br /> Pequot Lakes Hwy 371 MUA <br /> Project Name <br /> Show Contract Contract Contract Contract Spent Spent Spent Spent Total Total Spent <br /> Unposte Labor Consultant Expenses Total Labor Consultant Expenses Total Billed Received Hours <br /> d <br /> Project Number:013060058.000 Pequot Lakes Hwy 371 MUA <br /> JTD 25,000.00 500.00 25,500.00 8,716.50 24.30 8,740.80 8,740.80 8,740.80 70.25 <br /> v7.6.717(00�8)- Billing,Project Budgeting,Show Unposted Page 1 of 1 <br />