My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07 Fire Department Reports
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2017
>
11-07-2017 City Council Meeting
>
07 Fire Department Reports
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2017 12:24:02 PM
Creation date
11/2/2017 12:24:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�4UOT LAKES AREA FIRE BOARD <br /> MEETIN�i IVIISYIlTES t3CTOBEtt?5,2017 <br /> The quarterly�teetir�g�f the PLAFB was calied to order by Chairman Peterson.The minutes of the <br /> last meeting were not read. <br /> The third quarter�ire cafl report was discussed.There were 24 caUs. By types,there were 6 trees an <br /> poweeiine,5 aEarms gaing off,4 motor vehicie accidents,3 smoke scares,3 hazardous rreaterial <br /> lealcs,l grass fire,1 motor vehicie fiPe,and 1 outs6de fire.By location,there were 12 to Pequot <br /> Lakes,5 to the City a�f Breery Point,2 ta the City of.lenkins,2 to Loon Lake Township,i to Jenkins <br /> Township,�to Poptar Township,and 1 to Pelican Township.Twa bills were s�nt that totai <br /> $1900.00. Last year there were 23 calls during this ttme period. <br /> Training totaled 13 hours for fihe third quarter.By types there were 3 hours tr�ench rescue class <br /> room,3 hours trench rescue hands an,2 hours helicopter landing zone set-up&safety,2 hours <br /> operatror�of Ranger pump&skid unit,2 hours pump engine opera�ion,and 1 hour drivirt� <br /> departmer�t vehicles thru a�obstacle course. <br /> The third quar�er financial report toid us the Departrnent has sperrt about$113,000.00 for a <br /> $209,000.00 budget.�here are severai big ticket items that occur da�ring the fourth quarter that <br /> should get things back on target.Payroll wiil be approxi►natety$35,000.00.The ai�pack payment <br /> due is$31,OOO.QO.The new air compressor wi�h accessories and installation cpuld be close to <br /> $25,000.00.We carried over$75,OD0.00 fr�m our 2016 budget which also skews our numbers.By <br /> purchasing new aiF inasks this year,the Department saved$2500.00 due to not needing <br /> ce�t�fications.The air masks have a 15 year warranty.Sodd motioned to app�ove the report,second <br /> by lillehei,motion passed. <br /> Third quarter fire personnel and operation report followed.Tt�e DNR denied our 2017 matching <br /> f�nds grant appliption.Our washer/drye�grant from the 2014 AFG grarrt has finaliy been <br /> completed.The De�vartment is ie�process of oFdecing a new air cornpressor to fiil air battles.We are <br /> dealireg with a rtew vendor than ouf last compresso�purchase.All 3 of our engirtes passed the pu�p <br /> test for this year.Minor repairs were done to Engines 1&3 during the pump testin$procedure..We <br /> need new fire gbves that wiil be ordered soon.Pr�ces vary frorn$75.00 to$15tD.00 per pa�r.EMR <br /> refresher classes are being offered during Septernber and October to#hose who need them.We <br /> have ordered 12 new air mask batteries and 2 new 6 unit chargers to help with battery shor�age <br /> during incidents.Our new kitchen e�nge has been installed and is in operation.The Department is <br /> tookir►g into buming 2 houses in our fire district for trainirag.Tt�e Ciiy Council itas approved our <br /> pension fund increase to$42St?.00 per service year.We purchased 4 sets af trading qrds featuring <br /> our 2 main engBnes,tankers,and our Depar#ment's statistics of our contracted area.These cards <br /> will be used for fire preveritoon and promations. <br /> Tfie Department's 2017 AFG grant applocation is astcing for a new tanker truck with an estimated <br /> cast of$258,(�O.OQ.We received�e narrative por�ion from our grant writer and witl be compieting <br /> the application before the deadl6ne.'�'he reason for this is to replace our present Tanker 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.