My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01 Trailside Park Phase 1 Service Proposals
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2017
>
10-03-2017 City Council Meeting
>
09.01 Trailside Park Phase 1 Service Proposals
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 12:24:03 PM
Creation date
9/29/2017 12:24:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Trailside Park Engineering Estimate <br /> ENGINEERING-WSN <br /> Coordination with MNDoT $ 5,000 <br /> Pavilion HVAC,Mech,Elec,Civil,Struc. <br /> $ 17,000 <br /> Field Surveying $ 4,000 <br /> Site Greding and Utilities $ 5,500 <br /> SWPPP $ 2,500 <br /> Pond $ 2,500 <br /> Street Design in ROW $ 2,500 <br /> Spea $ 2,000 <br /> MEP Shop Drewings $ 2,500 <br /> HWY 371 Vacation <br /> $ 2,000 <br /> Retaining Walls $ <br /> Footings $ 1,000 <br /> Staking by Contractor S - <br /> Other Vacations/Easements/Legal Docs $ <br /> Sibley Street Design $ 30,000 <br /> SUB-TOTAL $ 76,500 <br /> 15%Dest6n Contin6enry $ 11,475 <br /> ENGINEERING FEE $ g7,975 <br /> On-Site Construction Observation <br /> $ 40,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.