My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-16-2007 Special City Council Minutes
Laserfiche
>
City Council (Permanent)
>
Minutes
>
2007
>
10-16-2007 Special City Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2017 12:26:36 PM
Creation date
8/18/2017 12:26:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council Minutes <br /> October 16, 2007 <br /> Page 4 of 5 <br /> -------------------------- <br /> � <br /> HE WILL GO BACK TO HIS REGULAR WAGE. COUNCIL MEMBER <br /> SJOBLAD SECONDED THE MOTION. MOTION CARRIED 5-0. <br /> 6.1. Trailside Estate Update <br /> City Engineer Tim Houle informed the Council that Landecker and WSN <br /> are recommending to reduce the financial security for the Trailside <br /> Development to $33,750 as all items on the punch list are not completed. <br /> Tim Houle suggested the following levels of acceptance: <br /> Sanitarv Sewer System <br /> The City will run and perform normal maintenance on the lift station. The <br /> developer will be responsible for the manholes and pipe upstream of the <br /> lift station as well as any lift station repairs caused by material from the <br /> gravity system or developer construction until overall acceptance by the <br /> City in the spring <br /> Watermain Svstem <br /> � The City will continue to provide the developer with water. The developer <br /> will be responsible for the watermain, valves, curb stops, and other <br /> components of the system until overall acceptance by the City in the <br /> spring. <br /> Storm Sewer System and Streets <br /> The developer will be responsible for all aspects of the storm sewer <br /> system and streets until overall acceptance by the City in the spring. The <br /> City will only plow from County Road 112 to the lift station to allow the City <br /> to periodically check the lift station. <br /> The Council indicated that in the spring of 2008, after all of the punch list <br /> items have been properly completed, the City will consider reviewing the <br /> acceptance of the various public improvements. <br /> COUNCIL MEMBER RYAN OVED TO ACCEPT A REDUCTION IN THE <br /> PROJECT BOND TO $33,750 TO BE PAYABLE TO THE DEVELOPER <br /> ONLY AFTER ALL IMPROVEMENTS ARE FULLY ACCEPTED. <br /> COUNCIL MEMBER SJOBLAD SECONDED THE MOTION. MOTION <br /> CARRIED 5-0. <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.