My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.02 Maintenance Facility Schematic Design
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2017
>
06-06-2017 City Council Meeting
>
09.02 Maintenance Facility Schematic Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2017 12:49:41 PM
Creation date
6/2/2017 12:49:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WIDSETH <br /> 2,01 SMITH <br /> NOLTING <br /> Brain erd Baxter <br /> 7804 Industrial Park Road <br /> PO Box 2720 <br /> Baxter.MN 56425-2720 <br /> 218.829.5117 0 <br /> 218.829 2517 12 <br /> Brainem@wsn.us.com D <br /> WidsetthSmdttNolting.com <br /> Preliminary Opinion of Probable Construction Costs <br /> City of Pequot Lakes-New Maintenance Department Facility <br /> Pequot Lakes,MN <br /> May 31,2017 <br /> Office and Parking Garage: <br /> New Post frame construction building consisting of 7,776 S.F.of open garage area and 960 S.F.of attached office area. <br /> Building features to include: <br /> -Two 14'w x 16'overhead sectional doors <br /> -Trench drain in garage area <br /> - In-floor hydronic heat throughout <br /> - Forced air HVAC in office area <br /> - Fire supression sprinkler system <br /> Garage Area 7,776 S.F.@ $ 85.00 = $ 660,960.00 <br /> Office Area 960 S.F.@ $ 145.00 = $ 139,200.00 <br /> Site work $ 300,000.00 * <br /> Salt Storage Shed $ 100,000.00 <br /> Sub-total $ 1,200,160.00 <br /> Contingency(15%) $ 180,024.00 <br /> Architecture&Engineering fees $ 75,000.00 <br /> Probable Project Costs $ 1,455,184.00 <br /> *Site work was deleted from scope of work,this is a rough estimate/placeholder <br /> Unconditioned Storage Building: <br /> New Post frame construction building based of 4,000 S.F.of open storage area. _ $55.00/S.F. <br /> Note: Square foot cost will decrease if building size increases and will increase if size decreases. <br />
The URL can be used to link to this page
Your browser does not support the video tag.