Laserfiche WebLink
AGENDA ITEM #9.2 <br /> City of <br /> Pc not <br /> Lakes = - <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Tim Houle <br /> Date: June 6, 2017 <br /> Subject: Maintenance Facility Schematic Design <br /> Report: The Core Team consisting of Council Members Pederson <br /> and Loukota, City Administrator Malecha, Public Works Supervisor <br /> Loven, and Doug Archer and myself from WSN, met for the second <br /> and last time on Thursday, May 25th in accordance with our scope of <br /> work. We reviewed an updated schematic building layout and some <br /> renderings. There was discussion on some adjustments to these. <br /> Attached are the latest building layouts and renderings. <br /> The building will be of timber post frame construction (this type of <br /> construction can more easily be worked on in the future by local <br /> contractors if needed versus a pre-engineered steel building). This <br /> structure can be expanded on the non-office side. It will have in-floor <br /> heat throughout—to provide a base temperature level (say 50 or so <br /> degrees) during the winter. The office area needs code required air <br /> exchange equipment, so it will also have a furnace and air conditioner. <br /> The schematic Site Layout was pulled out of our scope by the City <br /> Council to save some money. However, we did prepare a draft layout <br /> and discussed this with the Core Team. Attached is a Conceptual Site <br /> Layout Sketch. <br />