My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8(a) State Building Code Continuation, Discussion
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2017
>
05-18-2017 Planning Commission Meeting
>
8(a) State Building Code Continuation, Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 8:47:58 AM
Creation date
5/11/2017 8:47:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. For each evaporative cooler other than portable type 6.50 <br /> 15. For each ventilation fan connected to a single duct 4.50 <br /> 16. For each ventilation system which is not a portion of any heating or air- <br /> conditioning system authorized by a permit 6.50 <br /> 17. For the installation of each hood which is served by mechanical exhaust, <br /> including the ducts for such hood 6.50 <br /> 18. For the installation or relocation of each domestic-type incinerator . 11.00 <br /> 19. For the installation or relocation of each commercial or industrial-type <br /> incinerator 45.00 <br /> 20. For each appliance or piece of equipment regulated by this code but <br /> not classed in other appliance categories, or for which no other fee is listed <br /> in this code 6.50 <br /> 21. When Chapter 22 is applicable (see Section 103), permit fees for fuel-gas <br /> piping shall be as follows: <br /> For each gas-piping system of one to four outlets 3.00 <br /> For each gas piping system of five or more outlets, per outlet 0.75 <br /> 22. When Chapter 24 is applicable (see Section 103), permit fees for process <br /> piping shall be as follows: <br /> For each hazardous process piping system (HPP) of one to four outlets .... 5.00 <br /> For each piping system of five or more outlets, per outlet 1.00 <br /> For each nonhazardous process piping system (NPP)of one to four outlets 2.00 <br /> For each piping system of five or more outlets, per outlet 0.50 <br /> Other Inspections and Fees: <br /> 1. Inspections outside of normal business hours $30.00 <br /> (minimum charge-two hours) per <br /> hour* <br /> 2. Reinspection fees assessed under provisions of Section 305 (g) $30.00 <br /> per <br /> hour* <br /> 3. Inspections for which no fee is specifically indicated $30.00 <br /> (minimum charge-one-half hour) per <br /> hour* <br /> 4. Additional plan review required by changes, additions or revisions to <br /> approved plans $30.00 <br /> (minimum charge-one-half hour) per <br /> hour* <br /> *Or the total hourly cost to the jurisdiction,whichever is the greatest. This cost <br /> shall include supervision, overhead, equipment, hourly wages and fringe <br /> benefits of the employees involved. <br /> GI022.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.