Laserfiche WebLink
1997 EDITION <br /> TABLE NO. 1-A UNIFORM MECHANICAL CODE <br /> * This is a"fixed fee"based permit schedule. * <br /> Permit Issuance and Heaters <br /> 1. For the issuance of each mechanical permit . $23.50 <br /> 2. For issuing each supplemental permit for which the original permit has not <br /> expired,been canceled or finaled .. 7.25 <br /> Unit Fee Schedule <br /> (Note: The following do not include permit-issuing fee.) <br /> 1. Furnaces <br /> For the installation or relocation of each forced-air or gravity-type furnace or <br /> burner, including ducts and vents attached to such appliance, up to and including <br /> 100,000Btu/h(29.3 W) 14.80 <br /> For the installation or relocation of each forced-air or gravity-type furnace or <br /> burner, including ducts and vents attached to such appliance over 100,000 <br /> Btu/h(29.3kW) 18.20 <br /> For the installation or relocation of each floor furnace, including <br /> vent 14.80 <br /> For the installation or relocation of each suspended heater, recessed wall heater <br /> or floor-mounted unit heater 14.80 <br /> 2. Appliance Vents <br /> For the installation, relocation or replacement of each appliance vent installed <br /> and not included in an appliance permit 7.25 <br /> 3. Repairs or Additions <br /> For the repair of, alteration of, or addition to each heating appliance, <br /> refrigeration unit, cooling unit, absorption unit, or each heating, cooling, <br /> absorption or evaporative cooling system, including installation of controls <br /> regulated by the Mechanical Code 13.70 <br /> 4. Boilers,Compressors and Absorption Systems <br /> For the installation or relocation of each boiler or compressor to and including 3 <br /> horsepower(10.6kW), or each absorption system to and including 100,000 B— <br /> (29.3kW) 14.70 <br /> For the installation or relocation of each boiler or compressor over three <br /> horsepower(10.6kW)to and including 15 horsepower(52.7kW), or each <br /> absorption system over 100,000 Btu/h (29.3kW)to and including 500,000 Btu/h <br /> (146.6kW) 27.15 <br /> For the installation or relocation of each boiler or compressor over 15 <br /> horsepower(52.7kW)to and including 30 horsepower(105.5kW), or each <br /> absorption system over 500,000 Btu/h (146.6kW)to and including 1,000,000 <br /> Btu/h (293.1kW) 37.25 <br />