My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 Work Session to REview Street Improvements
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2017
>
02-21-2017 Special Council Meeting
>
3 Work Session to REview Street Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 1:02:44 PM
Creation date
2/15/2017 1:02:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• We need to see how traffic patterns change and how people use the streets to <br /> grasp the needed improvements; <br /> • Sidewalks in this area should be one sidewalk per street minimum; as traffic <br /> patterns are determined there may be a need for both sides of the street; <br /> • A walking loop could be created by establishing a path/sidewalk down Old <br /> Highway 371,turning at Rae Avenue and accessing the Paul Bunyan Trail going <br /> north to Main Street; <br /> • Explore the possibility of constructing low maintenance (e.g. class 5)trails in <br /> areas that are not heavily trafficked; <br /> • Street lights should be used on the main streets and one block off; <br /> • The same street lights should be used throughout the Downtown Mixed Use <br /> Zone. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.