County State Aid Highway 11 (SAP 018 - 611 -24) Coordination Meeting <br />June 16th, 2011 @9:00 am <br />Present: Mike Loven, City of Pequot Lakes <br />Nacy Adams, City of Pequot Lakes <br />Sandy Peine, City of Pequot Lakes <br />Tim Houle, WSN <br />Jim Hallgren, MnDOT <br />Rob Hall, Crow Wing County <br />Luke Wehseler, Crow Wing County <br />A. 2012 Construction Projects <br />1.) Government Drive Project Overview —Tim Houle <br />• The area being analyzed is from East Woodman Street to East Grove Street (five <br />blocks). The City is currently in the public input and concept stage. Once this study <br />stage is complete, the City Council will be asked to move forward to design phase. <br />Look to bury all overhead power on this project and future projects. <br />2.) CSAH 11 project overview — Luke Wehseler <br />• This project will be from TH 371 in Pecluot Lakes to CSAH 4 in Breezy Point. This is a <br />pavement rehabilitation project to improve the existing pavement conditions. The <br />current plan on rural sections is to mill and overlay on the driving lanes (24' wide). <br />The plan on the urban section is to mill and overlay from gutter to gutter. Looked at <br />adding in town items to this project but it was determined that one year would be <br />�. too short of a time to develop a plan for CSAH 11 in the urban section. Looked at <br />updating the pedestrian crossing to the current ADA rules, but determined that it <br />would not be feasible with a total reconstruct planned in the near future. Also, as <br />part of the 2012 overlay project there would be no impact to curb, gutter, and <br />sidewalk. <br />3.) TH 371 Project Overview —Jim Hallgren <br />• This project will be from Cullen Brook to Pine River. The project will mill and overlay <br />the driving lanes (24' wide). Shoulder updates will occur at Jenkins and ADA updates <br />will occur throughout the project. The turning movements at the TH 371 /CSAH 11 <br />intersection will likely stay the same, but MnDOT will look into it more with the <br />closing of two accesses on the west side of the intersection. <br />B. Project Coordination <br />• The CSAH 11 project will match into the TH 371 project at the east curb radius of the <br />intersection of TH 371 and CSAH 11. Need to make sure MnDOT installs traffic loops <br />before the County overlays CSAH 11. Will need to update the agreement for the <br />CSAH 11 /TH 371 signal between State, County, and City. <br />1.) Potential Construction timelines <br />• The TH 371 project is currently planning on being started at the middle of May 2012. <br />The CSAH 11 project will try to be constructed after the TH 371 project depending on <br />haul road routes for the TH 371 project. Government Drive Project could be a phased <br />project for two years if approved (2012 & 2013). <br />