My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Water Wastewater Monthly Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2011
>
07-05-2011 Council Meeting
>
09 - Water Wastewater Monthly Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2014 9:50:58 AM
Creation date
3/19/2014 9:49:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wastewater Dept. <br />I. Facility Performance: <br />a. CBOD Concentration <br />Influent — 367 mg/1 (No Design Listed) <br />Effluent — mg/l <br />b. TSS Concentration <br />Influent — 268 mg/l (No Design Listed) <br />Effluent — mg/1 <br />c. Effluent Fecal Coliform — 40 <br />Permit Condition — 200 organisms /100 ml <br />d. Flow - Average Daily Flow — 55,000 gallons (Design — 121,795 gal/day) <br />Maximum Daily Flow — 70,000 gallons <br />Minimum Daily Flow — 32,000 gallons <br />Total Monthly Flow — 1,261,000 gallons (As of the 24th <br />II. Operations and Maintenance: <br />�. • The monthly MPCA Discharge Monitoring Report (DMR) was completed and <br />submitted. <br />• June 2nd, finished mowing at WWTP. <br />• June 14th, spoke to Herschel Blasing with the MPCA about our permit requirements and <br />putting together a list of those requirements to help out the new operator. <br />• Also, on the 14t`, collected quarterly influent sample and pond samples. Brought fecal <br />sample to A.W. Lab. <br />• June 16th, added two pails of SuperZymes to the Primary Pond. (North Pond) Used <br />sawzall to cut small trees that had fallen across trail to MW #6. <br />• June 17th, Steve Fode with TEAM Lab, sprayed weed - killer on pond dikes. Pulled pump <br />#2 from main lift station and removed debris. Noticed the impeller is in rough shape, <br />will need to be replaced. <br />• June 23`d, completed a draft farm lease agreement for Bill Tulenchik. He would like to <br />lease the spray - irrigation site for another four years. His current lease will expire <br />December 31, 2011. <br />Report Submitted By: Tina Nolden (Water /Wastewater Manager) <br />Please call me if you have any questions /comments. <br />218 -568 -5604 or 218 - 820 -2125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.